BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Telluride, Colorado. Completed plans call for the renovation of a water / sewer project.

The Town of Telluride owns and operates several water treatment facilities to provide drinking water for the service area. The Pandora Water Treatment Plant (WTP) and the Mill Creek WTP are the primary water treatment facilities in operation. Each plant provides roughly 50% of the demand during peak season. The Mill Creek WTP was originally constructed in 1987 as a conventional filtration plant. The 1.0 MGD facility contains two parallel treatment trains which at one time consisted of flocculation tanks and up flow tube settlers in sedimentation tanks. The multimedia filters were taken out of service to accommodate ultra-filtration membranes installed downstream of the flocculation/sedimentation process. Both granular media filters were removed. The ultra-filtration membranes are currently on the last of their life cycle and must be replaced (to include the headers and stands). A hot water wash clean-in-place is also needed. Mill Creek WTP needs a new filter/membrane and clean-in-place system commissioned and implemented to include system and process integration within the existing footprint. Existing raw water data can be requested. Project includes raw water quality analysis for chemical additions needed for new filters before installation of equipment. Water production will be maintained at 1MGD. Teams may be contractor, engineer, or vendor lead. Project team is expected to help with any CDPHE requirements and documentation. February 9, 2022 Optional Pre-Proposal Site Visit February 10, 2022 Optional Pre-Proposal Zoom Meeting (pending) March 4, 2022 Proposals Due March 18, 2022 Contract Award April 18, 2022 Project Start December 1, 2022 Project Completion December 2, 2022 Final Project Inspection Completed by Town Staff December 9, 2022 Project Closeout/End of Contract Project Location Mill Creek Water Treatment Plant Telluride, Colorado 81435

Post-Bid

Water / Sewer

$3,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
4
Bidding Soon
74
All Active Projects
25
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2022

April 18, 2022

img_map_placeholder

1995 CO-145, Telluride, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.