Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Telluride, Colorado. Working plans call for site work for a playground / park / athletic field.
As of May 16, 2024, no bids received. No definite plan for the rebid. The County's new Mill Creek Park will be located on a 1-acre parcel located in San Miguel County along Highway 145 at Mill Creek Road, across from the Valley Floor, near the Shell Station. The park design was developed through a public process that included historic surveys of the site for archeological artifacts and design meetings with the San Miguel County Open Space Commission. The resulting design is a natural park that references the linear geology of the cliffs and mountains above, and includes minor grading work to create a new ADA soft surface walking trail with benches and picnic tables and other site features. The park includes several recreational features including wooden and organic nature play features, a wooden play structure (provided by playground manufacturer, contractor to install), a bike skills park loop for young children and a bike repair station. A small shade structure near the playground has been conceptually designed for park users. The design incorporates an existing drainage channel running through the park to the Valley Floor, and introduces a more naturalized shape with boulders and plantings along with a wooden pedestrian bridge and smaller bridge for the bike loop for crossing the drainage channel. Native perennial plants and new tree plantings are incorporated into several new pollinator gardens throughout the park, and the species were carefully selected in collaboration with County Staff and local researchers who have been studying, documenting and growing pilot projects on pollinator plants in the area. Areas outside of the pollinator gardens that require regrading incorporate native seed mixes to increase biodiversity. If you have difficulty reading or accessing the bid documents, please contact Janet Kask at 970-369-5469 or janetk@sanmiguelcountyco.gov
Final Planning
Playgrounds / Parks / Athletic Fields
$300,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 26, 2024
November 27, 2024
CO-145 and Mill Creek Rd, Telluride, CO
Related To This Project
Telluride, CO
--
Telluride, CO
Bid Date: Mar 04 2022
Telluride, CO
Bid Date: Mar 11 2022
Telluride, CO
Bid Date: Sep 30 2024
Telluride, CO
Bid Date: Mar 04 2022
Telluride, CO
Bid Date: Oct 15 2023
Telluride, CO
--
Telluride, CO
Bid Date: Jun 23 2023
Telluride, CO
Bid Date: Jun 14 2023
Telluride, CO
Bid Date: Mar 27 2023
Telluride, CO
Bid Date: Apr 12 2023
Telluride, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.