BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Shoreline, Washington. Design plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project will provide multi-modal improvements to the 175th corridor, between Stone Ave N and I-5. The project will enhance levels of service for motorists, transit, and freight and dramatically improve overall safety, mobility, and accessibility for pedestrians and cyclists. The project will widen the roadway, provide new pedestrian and bicycle facilities, and address accessibility issues that exist along the corridor. The planned multi-modal improvements will enhance overall facility use, increase facility user confidence, and provide multi-modal connections to transit, parks, schools, churches, shopping centers, and improve access to other adjacent land uses. A new signal system will be installed at the intersection of N 175th Street and Meridian Avenue. Seismic upgrades will be installed to stabilize the roadway in the vicinity of Ronald Bog Park. The Corridor Project will be delivered in phases with Phase 1 constructing improvements in the vicinity of the N 175th Street and Meridian Avenue intersection and east along the Ronald Bog Park frontage. The design of the Corridor Project has progressed to 60% and design of Phase 1 is currently scheduled for 90% completion in Q1 2025. As of January 9, 2025, this project is included in the City of Shoreline's Fiscal Year 2025 - 2030. It is currently in the design phase. Construction is expected to take place in 2025 and 2026. +*Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$62,445,491.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
48
Bidding Soon
851
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

img_map_placeholder

N 175th St, Shoreline, WA


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.