Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 9, 2024 at 7:00 PM

Updated December 18, 2025

Site work and paving for a civil project in Shoreline, Washington. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

6th AVE NE, NE 168th ST Water Main Replacement. North City Water District seeks a contractor to furnish all labor, materials and equipment necessary to complete the project referenced above. The work shall include, but is not limited to: furnishing all labor, equipment, and materials necessary to construct approximately 3,800 linear feet of 12-inch and 8-inch restrained joint Class 52 ductile iron water main, including piping, appurtenances, fittings and valves; install 6 fire hydrant assemblies including 6-inch restrained Class 52 ductile iron piping, valves, fittings and restraints and fire hydrant connections; reconnect 87 water service lines of Type K copper (1-inch and 2-inch), replace water meter boxes and lids in the same locations; connections to existing water system; and pavement restoration per contract drawings. Work will be located on public right-of-way. The time for completion of the work is within one hundred fifty (150) working days of the date appearing on the "Notice to Proceed". Work within NE 155th Street may not begin until November 2024. All questions in regards to the bidding or technical items of the project shall be to David Evans and Associates, Inc. (Engineer) by email at scott.christensen@deainc.com or craig.christensen@deainc.com.

Bid Results

Water / Sewer

$1,588,629.00

Public - City

Paving, Site Work

25

10

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
274
Active Projects
121
Bidding Soon
2,130
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 4, 2024

February 3, 2025

Project location map

Multiple Locations, Shoreline, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed