Site work for a water / sewer project in Gresham, Oregon. Completed plans call for site work for a water / sewer project.

As of June 23, 2025, construction for all packages had commenced starting Summer 2024, per publicly available information. The previous solicitation is for reference purposes only. Project documents will only be issued to firms who sign a Non-Disclosure Agreement (NDA). James W. Fowler Co. (JWF, Contractor) is requesting subcontract pricing for all costs associated with cast-in-place CARV and Access Vaults as a Limited Competition second-tier subcontractor under Bull Run Conveyance Partners on package S-03 Clearwell Finish Water Trenchless on the Portland Water Bureaus (PWB) Bull Run Filtration Pipelines Project (Gresham, OR). This scope includes open excavation installation of 66 pipeline from AFWP STA 96+17.11 to STA 97+56.77, open excavation and installation of 66 pipeline from LFWP 5+20.03 to STA 5+91.58, open excavation and installation of 24 pipeline for PHWD connection to the 66 pipeline, all interconnections between these pipelines (including insulated flange/flange connection at STA 97+56.77), flange/flange connections with tandem harness couplings at the connection to the Clearwell Facility, furnish and install HMPWE #2 AWG stranded copper wire encased in 1.5 schedule 80 PVC with exothermic weld to 66 WSP, and backfilling of all excavations associated with these installations. Installation of ARV/Access Vaults will be by others and scheduling of backfilling will be coordinated between these scopes. Please submit any questions, interpretation, or clarification of this Invitation to Bid to JWF no later than June 20, 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Under Construction

Water / Sewer

$130,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
81
Bidding Soon
1,065
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

December 9, 2024

Project location map

SE Carpenter Ln, Gresham, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.