Site work and paving for a road / highway in Reno, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of April 14, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The RTC reserves the right to accept or reject any or all alternates or options or any combination thereof. The RTC also reserves the right to waive any irregularities and/or informalities in the submitted Bid Forms Prospective Bidders must be Contractors presently licensed under the Nevada State Law for the type of work specified herein. Every Bid shall be accompanied by a Surety Company Bid Bond, or by a Certified or Cashier Check made payable to the Regional Transportation Commission in the amount of not less than five percent (5%) of the Bid, said amount to be forfeited to the RTC should the Bidder to whom the Contract is awarded fail to enter into a Contract in accordance with the Bid and other Contract Documents within ten (10) calendar days after award Prevailing wage rates for Washoe County shall be posted on the work site and paid to all classifications of labor as required by the laws of the State of Nevada. The work to be performed under this Contract shall be commenced by the successful Bidder after the executed Contract Documents have been submitted, and within five (5) calendar days of the commencement date set forth in the Notice to Proceed The work to be performed under this Contract shall be commenced by the successful Bidder after the executed Contract Documents have been submitted, and within five (5) calendar days of the commencement date set forth in the Notice to Proceed. The work, including any and all alternates and options, shall be completed within sixty (60) working days after the commencement date set forth in the Notice to Proceed. Engineer Opinion of Probable Cost: $2,000,000 to $2,500,000 For questions about the bid process, please contact Christopher Benham [ph: 775-335-1868; fax: 775-335-1455; cbenham@rtcwashoe.com]. Prospective Bidders must be Contractors presently licensed under the Nevada State Law for the type of work specified herein. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This report presents the results of Eastern Sierra Engineering's (ESE's) geotechnical investigation and pavement design for the proposed California Avenue project. ESE understands the project will include the rehabilitation and reconstruction of California Avenue from the intersection of California Avenue and Arlington Avenue to the intersection of California Avenue and Newlands Circle, (approximately 2,275 feet), in Reno, Nevada. The limits of the project are shown on Figure 1 included in Appendix A. The following scope of services was provided: Located and marked four (4) test pit locations and contacted Underground Service Alert (USA) to notify them of our intent to excavate at the site; Excavated, logged, and sampled four (4) test pits to depths of 3.0 to 4.0 feet below the existing ground; Performed laboratory testing that included particle size analysis, Atterberg limits, moisture content, soils classification/description, moisture/density relationship curves and Resistance value (R-value) testing; and Prepared this report that summarizes field activities, subsurface soil conditions, laboratory testing, traffic data analysis, and pavement design(s) utilizing the 2007 RTC Flexible Pavement Design Manual (here-in referred to as RTC 2007) and the 2021 RTC Structural Design Guide for Flexible Pavement (here-in referred to as RTC 2021). Also included are site plans with approximate test pit locations, test pit logs, plasticity charts, particle size distribution charts, moisture/density relationship curves, R-value graphs and recommendations for roadway grading. This report was prepared for the sole use of the Regional Transportation Commission of Washoe County (RTC), the only intended beneficiary of ESE's work.

Award

Roads / Highways

$2,024,007.00

Public - County

Paving, Site Work

24

8

4

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
12
Bidding Soon
243
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

June 12, 2023

img_map_placeholder

California Ave, Reno, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.