Published April 14, 2023 at 8:00 PM

Updated February 13, 2024

Site work and paving for a playground / park / athletic field in Minneapolis, Minnesota. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Construction services for parking lot improvements on the duluth campus. Refer to the request for bid documents (found in the attachments tab) for full project details/requirements. Before submitting questions about the rfb via the questions tab, read and review the rfx instructions, requirements, and rights reserved by the university document and all attributes in the attributes tab. These provide valuable information and address frequently asked questions. The scope of Work consists of the repair/rebuild of Parking Lot U to include full-depth reclaiming of existing pavements, new asphalt, selective curb and gutter removal and replacement, stormwater control enhancements, and the addition of new light poles with LED lights. Project is located on the University of Minnesota Duluth campus at 1301 Junction Avenue. This lot is approximately 65,000 square feet. LHB Inc.is the Architect/Engineer of Record for the Project. The University requires the Project to be substantially complete by no later than July 28, 2023. The intended construction start date is May 8th, 2023. Deadline for RFB Questions March 21, 2023 at Noon

Award

Playgrounds / Parks / Athletic Fields

$948,850.00

Public - State/Provincial

Paving, Site Work

21

24

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Terrazzo Flooring, Carpeting, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Trenching and Backfilling, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
55
Bidding Soon
938
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2023

May 8, 2023

img_map_placeholder

1301 Junction Avenue, Minneapolis, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.