EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2024 at 7:00 PM

Updated January 31, 2024

Renovation of a transportation facility in Reno, Nevada. Completed plans call for the renovation of a transportation facility.

As of May 25, 2023, the project has been awarded, however, a timeline for construction has not been confirmed. The Reno-Tahoe Airport Authority (RTAA) Purchasing and Materials Management Division, in accordance with the provisions of NRS Chapter 338 is currently accepting sealed Invitation to Bid (ITBs) from qualified Contractors per NRS 338.1382 and licensed to work in the State of Nevada to install Owner-supplied podiums, scanners, and ticketing inserts, and install Contractor supplied electrical and data lines and ancillary work associated with the Project, and to provide all material, labor, tools, expendable equipment, transportation services, permits and fees, utilities required, and all incidental items necessary to provide the scope of work entitled "Shared Use Podiums, Phase 2, Electrical and Data Installation Project." The purpose of the conference is to review and discuss the Invitation to Bid (ITB) Documents, including the contract drawings and specifications. You must register in the NGEM Supplier System to continue to receive ITB solicitations. Your Supplier Registration profile will be shared with all participating government entities. Per the Federal Aviation Administration's Contract Provision Guidelines for Obligated Sponsors and AIP Projects dated January 20, 2023, the following provision is hereby referenced for this solicitation: Title VI Assurances. Question Cuttoff Date & Time 3/30/2023 08:00:00 PM (ET)

Award

Transportation Terminals

$262,302.00

Public - City

Renovation

12

12

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Flooring
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Switchboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
14
Bidding Soon
221
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2023

May 15, 2023

img_map_placeholder

2001 E Plumb Ln, Reno, NV

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Shared Use Podiums, Phase 2, Electrical and Data Installation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.