EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 22, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Whitehall, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bid security in the amount of ten percent (10%) of the bid price shall be submitted with the bid. Additional post-award bonding requirements for this project include a Performance Bond, a Labor and Material Payment Bond and a Maintenance Bond. In general, the Project involves the 2023 Construction of about thirty-one (31) ADA Handicap Ramp Corners along four (4) Street Projects within Whitehall Township. 1) Minnesota Drive (8) ADA Ramps - (from Midway Road to California Avenue) - Fullerton Area. 2) Wood Street (3) ADA Ramps - (at North 2nd Avenue intersection) - West Catasauqua Area. 3) Franklin Street (4) ADA Ramps - (at Front Street Intersection) - Fullerton Area. 4) Andrew Drive (9) ADA Ramps - (from Presidential Drive to Avery Lane) - Peachtree Townes - Fullerton Area. The Total Estimated Concrete Curb and Sidewalk Replacement Quantities for all four (4) Street Projects is approx. 300 Ft. of Concrete Curbing and approx. 2,000 Sq. Ft. of Concrete Sidewalks. The Contractor is required to pay current Federal Davis-Bacon Wage Rates. If the projects wage rates are modified ten (10) or more days prior to the bid opening, an addendum will be issued to each prospective bidder. Should an updated version be applicable, it will be faxed or emailed as an Addendum to each prospective bidder. The Contractor is also required to contact and solicit Services from Minority and Women Business Enterprises (MBE/WBE) and document their solicitation and commitment on the Federal Form DCA BHD 168 Statement Form with their Bid Submission. Bidders shall have at least five (5) years past experience in ADA Ramps concrete curb and sidewalk work performed under or similar to CDBG Federal ADA Requirements and Provisions. The successful bidder is expected to be able to start work in May 2023 and shall complete all work by August 25, 2023. Liquidated damages of $250 per calendar day will be assessed to the Contractor for any HC Ramps that are not completed by the August 25, 2023, completion date until its satisfactory completion. Whitehall Township reserves the right to determine, in its sole discretion, whether any aspect of a bid satisfactorily meets the criteria established in this Request for Bid, to accept either in whole or in part, any one bid or combination of bids, to waive or permit the curing of any immaterial defects informalities or irregularities in a bid as permitted by law, to reject any or all bids with or without cause, and to take any action which the Township deems appropriate. The Township intends to select that bid(s) which, in the sole opinion of the Township is/are most favorable and in the best interests of the citizens of Whitehall Township.

Award

Sidewalks / Parking Lot

$98,195.00

Public - City

Paving, Site Work

3

11

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
195
Bidding Soon
3,102
All Active Projects
1,319
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2023

May 30, 2023

img_map_placeholder

Multiple Locations, Whitehall, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 ADA Handicap Ramps, Curb and Sidewalk Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.