Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 8, 2025
Site work and paving for a road / highway in Fitchburg, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
This project includes the reconstruction of S. Syene Road from McCoy Road to south of E. Cheryl Parkway. This would be a rural to urban reconstruct with intersection improvements. A roundabout is planned at E. Cheryl Parkway. This project would also evaluate a potential speed limit reduction on S. Syene Road and be designed based on that lower speed limit. Note: $800,000 for the railroad crossing at Syene and Lacy moved from CIP #3468 Lacy Road to CIP #3368 S. Syene - McCoy to Lacy. This also changes the timing on the railroad improvements from 2017 to 2021 based on the different project timelines. To be funded by TID #4. 2018-2027 CIP Update: Accelerate planning from 2019 to 2018 and increase from $15,000 to $25,000. In order to be eligible for applying for grant funding we will need sufficient planning completed to know the typical cross section, pedestrian accommodation methods, and have cost estimates prepared based on these factors. 2021-2030 CIP Update: Increased funding to update costs based cost estimate completed as part of Design Study (total increased from $6,440,000 to $8,000,000 in 2021. Allocated some funding to utility assessments. 2022-2031 CIP Council Amendment: Split project into two phases and added funding ($60,000 in 2022 and $2,000,000 in 2023) for the second phase, paid by grant funding and additional borrowing. 2023-2032 CIP Update: Funding for phase 2 increased to reflect revised construction cost estimate. Phase 2 is postponed until 2024. In 2021, phase 1 was assumed to cost $5.4M to construct and 90% construction cost estimates are now $6.26M. Phase 2 includes 1/2 mile of Syene Rd from Nannyberry Park to W. Clayton as a City project and W. Clayton through the McCoy intersection as a HSIP grant funded project. The phase 2 city project is estimated to cost $3.25M and the phase 2 HSIP project is estimated to cost $2.75M. Additional grant funding is being pursued in the summer of 2022 for the city portion of phase 2. $2000 of assessment is included in 2023 for sanitary laterals. This brings the project total cost up $2.54M to $13.85M from the previously estimated $11.32M. 2025-2034 CIP Update: Updated cost based on 90% engineer's opinion of probable construction cost. Amounts are re-budgeted for phase 2. Previously authorized funding: Phase 1: 2018: planning/design/engineering $25,000 (debt) 2020: planning/design/engineering $580,000 (debt) 2021: construction $8,000,000 ($500,000 storm assessed; $160,000 water assessed; $880,000 TID #4; $6,460,000 debt) Phase 2: 2022: planning/design/engineering $60,000 (debt) 2024: construction $4,306,000 (debt/grants) Project Fund Balance as of 12/31/23: $3,650,652 As of May 7, 2025, this project is under construction.
Under Construction
Roads / Highways
$8,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
To Be Determined, Fitchburg, WI
Related To This Project
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Jun 09 2025
Fitchburg, WI
Bid Date: Jul 25 2025
Fitchburg, WI
Bid Date: Jul 29 2025
Fitchburg, WI
Bid Date: Jun 26 2025
Fitchburg, WI
Bid Date: Jul 28 2025
Fitchburg, WI
Bid Date: Jul 28 2025
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Jul 03 2025
Fitchburg, WI
Bid Date: Apr 09 2019
Fitchburg, WI
Bid Date: Apr 24 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
