BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work and paving for a road / highway in Fitchburg, Wisconsin. Working plans call for site work for a road / highway; and for paving for a road / highway.

This project is currently on hold. Bids were not opened no additional information is available. This Project Consists of Approximately 2000 Sf of Concrete Flatwork, Con-sisting Mainly of 5" Thick and 7" Thick Sidewalk. Proposals Shall Be Ac-companied by a Bid Bond or Certified Check in the Amount of 5% of the Bid, Payable to the Fitchburg Treasurer, as a Guarantee That the Bidder, if the Bid is Accepted, Will Execute and File Contract and Bond Within 15 Days of Award. Performance and Payment Bonds Each 100% of the Bid, With Executed Contract is Required of Suc-cessful Bidder.

Final Planning

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
270
Active Projects
88
Bidding Soon
1,650
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

July 28, 2025

Project location map

Multiple Locations, Fitchburg, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.