Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Pendleton, Oregon. Completed plans call for site work for a water / sewer project.
COMPLETE PROPOSAL MUST BE RETURNED. Bidders shall use the attached bid form. Bidder shall complete unit price, extended price and lead time for each component, along with the bid subtotal, freight total and total bid amount, and the amount of days the bid will be valid. The firm name and signature of an authorized person shall be in space provided. All bids shall be valid for 60 calendar days. Bids may not be changed or withdrawn after the opening of Bids. Along with the bid sheet form, please provide manufacturer's cutsheets for all items listed in the bid sheet. TANK AND AIR COMPRESSOR SPECIFICATIONS The specifications for the 30,000 gallon air over water hydropneumatic tank and Instruments and air compressor are set out in Attachment 1, attached to this document and incorporated by this reference. Drawings are attached as Attachment 2. 3.0 CONTRACT AWARD Award of the contract will be made to one bidder. Notice of Intent to Award by the Board of Commissioners will normally be made within 20 calendar days of opening. If a longer period of time is required, all bidders will be notified. Following the 7 day protest period, a contract will be provided to the selected bidder. DELIVERY All items listed in the bid sheet need to be delivered by March 1, 2024. Bidders shall set forth the date of delivery in the space provided on the bid sheet. Deliveries should be consolidated as much as possible to minimize the number of deliveries received on site. Delivery date shall be taken into consideration before awarding the contract. The equipment herein specified shall be delivered to the area of Hermiston, Oregon. A more specific delivery location will be determined at a later date. Any necessary parts for operating the equipment that are not mentioned in the specifications are, by this inference, included and shall not become a cause for extra compensation to the successful bidder. 5.0 REQUESTS FOR INFORMATION All requests for information (RFI) need to be provided in writing to the following email address (ordnanceproject@umatillacounty.gov) seven (7) calendar days before the bid due date. Response to RFIs will be completed and published on Umatilla County's website 6.0 CUTSHEETS AND MANUALS Bidders are to supply manufacturer's standard bid package and additional data as requested by specification 43 42 21, section 1.4A as part of the supplier's bid package. Within 6 weeks of award, the successful bidder will need to submit all submittal data required in specification 43 42 21, sections 1.4A and 1.4B electronically for technical approval to ordnanceproject@umatillacounty.gov. Two (2) weeks prior to shipment, the successful bidder will need to submit all submittal data required in specification 43 42 21, section 1.4C electronically for technical approval to ordnanceproject@umatillacounty.gov Address (ordnanceproject@umatillacounty.gov) seven (7) calendar days before the bid due date. Response to RFIs will be completed and published on Umatilla County's website SCOPE A. This specification describes the requirements for a Hydropneumatic Surge Control System. The purpose of the system is to minimize transient pressures from shock waves due to pump shutdown and startup. The System shall be designed for raw river water service. 1.3 CODES AND STANDARDS A. Pressure vessels shall be in accordance with the latest revision of the American Society of Mechanical Engineers (ASME) Code for Unfired Pressure Vessels, Section VIII, Division 1. B. All local Plumbing Codes shall be met. C. The system and anchorage of the surge tank shall conform to the International Building Code (IBC). D. The National Electric Code (NEC) shall be used for all wiring. 1.4 SUBMITTALS A. Approval Data 1. Manufacturer's Standard Submittal Package 2. Approximate Weight and Overall Dimensions of the Surge Tank 3. Air Compressor Manufacturer's Standard Cutsheets B. Drawings 1. Complete design calculations for all surge tanks. Calculations shall be signed by a mechanical or structural engineer registered in the State of Oregon verifying that the tanks have been designed to meet all design criteria given in these specifications. i. Including loads, and connection details to be used for concrete foundation design. ii. The design shall allow for the most severe combination of load conditions. 2. Detailed fabrication drawings, system assembly and installation drawings, catalog data and dimensional drawings showing accessories, supports, and connections. 3. Specifications for system components, accessories, and protective coatings. 4. Manufacturer recommended set points, alarm set points and alarm time delays for all control devices. i. PLC control system and programming will be provided by Others. C. Service Manual and Warranty 1. Operation and Maintenance Manuals 2. Connection Diagrams 3. Results of all Factory Tests. 4. Copy of ASME Pressure Vessel Code Form U-1A. 5. Manufacturer Warranty Documentation
Post-Bid
Water / Sewer
$60,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2023
May 10, 2023
To Be Determined, Pendleton, OR
Related To This Project
Pendleton, OR
Bid Date: May 04 2023
Pendleton, OR
Bid Date: Apr 18 2023
Pendleton, OR
Bid Date: Nov 16 2021
Pendleton, OR
Bid Date: Sep 27 2021
Pendleton, OR
Bid Date: Sep 27 2021
Pendleton, OR
Bid Date: Sep 27 2021
Pendleton, OR
Bid Date: May 04 2023
Pendleton, OR
Bid Date: Feb 06 2020
Pendleton, OR
Bid Date: Mar 17 2023
Pendleton, OR
Bid Date: Mar 17 2023
Pendleton, OR
Bid Date: May 12 2023
Pendleton, OR
Bid Date: Nov 06 2019
Pendleton, OR
Bid Date: Mar 09 2023
Pendleton, OR
Bid Date: Jan 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.