BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Whittier, California. Completed plans call for the renovation of a educational facility.

1. Remove and install a brand-new open duct system inside classrooms B-12 and B-11. Scope includes: a. Remove and dispose existing duct system. b. Demo all T-Bar ceilings, remove tiles, T-Bar metal and hanging wires. c. Install new open duct system. d. Demo all stucco form e. Install stucco patch 8' X 40' f. Polybond coat, brown coat and finish coat. g. Remove all existing flexible ducts and replace with spiral ducts (22 or 24 gauge). h. Install new A/C registers i. All duct work to be suspended through wires (metal hangers). j. Install three (3) strips of black LED track lights, with thirty (30) LED light track hats, ten (10) pieces per line, and motion switches on existing locations. k. Paint wall ceilings of classrooms and duct work. Ceiling to be painted with elastomeric primer base (2 coats). Elastromeric paint (color black / 2 coats). A/C Duct work to be painted all black. l. Provide one (1) scissor lift (as needed) m. Provide 8-foot / 10-foot / 12-foot A-Frame ladders (as needed) n. Provide trash clean-up and disposal. o. Cover all cabinets and floor inside the classrooms with plastic, ram board paper or plywood. p. Remove all existing furniture in the classrooms prior to performance of the work. questions and requests April 14, 2023, at 2:30 p.m

Award

Educational

$189,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
113
Bidding Soon
2,180
All Active Projects
999
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

img_map_placeholder

3600 Workman Mill Rd, Whittier, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.