Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 10, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a fire / police facility in Bolton, Massachusetts. Completed plans call for the renovation of a fire / police facility.

As of May 10, 2023, this project has not yet been awarded. A timeline for award has not yet been established. Fire Department Garage Roof Replacement- The work consists of removal of existing urethane spray foam and original built up tar and gravel roofing systems down to existing gypsum decking. Contractor must provide proof of experience working with and repairing gypsum deck. The Work will be substantially completed within 6 weeks from the date of Notice to Proceed, and completed within 8 weeks from the date of Notice to Proceed.

Bid Results

Fire / Police

$220,575.00

Public - City

Renovation

11

12

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
910
Active Projects
474
Bidding Soon
5,916
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

May 26, 2023

Project location map

Multiple Locations, Bolton, MA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed