BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Cincinnati, Ohio. Completed plans call for the renovation of a 304,000-square-foot educational facility.

Submit all questions regarding this RFQ in writing to Michael Myres at michael.myres@uc.edu with the project number included in the subject line (no phone calls please). Questions will be answered and posted to Opportunities page on the OFCC website on a regular basis until one week before the response deadline. The name of the party submitting a question will not be included on the Q&A document. The University of Cincinnati is seeking proposals to provide Construction Manager at Risk services for the 5 th Phase of the Muntz Hall Rehabilitation at the University of Cincinnati Blue Ash Campus. The anticipated start date for the Preconstruction Services is June 2023 and the anticipated construction start date is January 2024. The University of Cincinnati Blue Ash campus consists of six buildings, totaling approximately 304,000 GSF. The oldest building, Muntz Hall was built in 1967 with a subsequent addition built in 1975. Muntz Hall is the primary classroom, faculty office and student services building on campus. Muntz Hall has a GSF of 171,425 SF, on 3 stories above grade, with a partial basement mechanical area. This phase of the overall renovation project will involve approximately 19,000 SF and is broken down as follows: Atrium- 7,160 sf, Academic Advising- 7,365 sf and Student Life- 4,384 sf. Professional design services have been acquired by the Contracting Authority under a separate contract. The Program of Requirements ("POR") has been developed as a part of this project by the Architect/Engineer ("A/E"). All aspects of the project and related issues will be implemented and operated consistent with the Contracting Authority and/or Owner's policies and procedures. The proposed Phase 5 work is a continuation of the renovation improvements to Muntz Hall on UC's Blue Ash College campus. This work will include the planning, design and construction of Phase 5 as it has been further defined by the ongoing Masterplan and is understood to include the following: o Atrium / student collaboration space o Advising Wing renovations o Student Life area renovations o Restroom renovations o Site improvements from the east parking lot to the north entrance o Improvements to some spaces adjacent to the atrium as required for egress, storage and mechanical and fire protection systems modifications. CM Preconstruction Services Start 06 / 23 Construction Stage Notice to Proceed 01 / 24 Substantial Completion of all Work 05 / 24 Substantial Completion of all Work 05 / 24 E. EDGE Participation Goal Percent of the CM's total compensation excluding CM's Contingency* 10.0%

Post-Bid

Educational

$7,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
130
Bidding Soon
2,355
All Active Projects
1,107
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2023

January 1, 2024

July 31, 2025

img_map_placeholder

9555 Plainfield Rd, Cincinnati, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.