BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Berthoud, Colorado. Completed plans call for site work for a water / sewer project.

The Work to be performed under this Project generally includes: The supply and installation of approximately 1,084 lineal feet of 6-inch PVC C900 DR 14 waterline and appurtenances near the intersection of LCR 8 and LCR 21, to complete replacement of the existing 6-inch asbestos cement waterline. The supply and installation of new meter pits and service lines that will replace existing meter pits that are currently connected to the existing waterlines that will be replaced. Proper abandonment in place of the existing 6-inch asbestos cement waterline using a flowable fill material. Proper abandonment in place of the existing 1.5-inch PVC waterline. All other labor, materials, supervision, traffic control, restoration and revegetation, materials testing, equipment, tools, pipe bedding material, concrete for thrust blocking, and all other additional items including permits necessary to complete the Work in substantial conformity with the Plans and Specifications. The primary location of the work is in Berthoud, Colorado at the intersection of LCR 8 and LCR 21. All work must be completed, and the waterline placed in service no later than June 29, 2023. The completion date has been established by Larimer County to accommodate the construction of a traffic circle at the subject intersection. Completing the waterline replacement project by this date is critical to the overall project schedule established by Larimer County. Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Any resulting addenda will be issued no later than 3:00 PM on Thursday April 13, 2023. Call Mr. Hebert at 970-344-6374 to verify receipt of your questions. The primary location of the work is in Berthoud, Colorado at the intersection of LCR 8 and LCR 21. All work must be completed, and the waterline placed in service no later than June 29, 2023. The completion date has been established by Larimer County to accommodate the construction of a traffic circle at the subject intersection. Completing the waterline replacement project by this date is critical to the overall project schedule established by Larimer County.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Site Work

18

7

2

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
69
Bidding Soon
1,369
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

May 25, 2023

Project location map

8th St, Berthoud, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.