BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Mabton, Washington. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all labor, materials, and equipment necessary for construction of the Drilling of Wells 7 and 8. Work shall include, but not be limited to, the following: File a Start Card with the Department of Ecology; Implement erosion control, environmental protections, develop and implement an SPCC plan, take preconstruction and postconstruction site photos, and perform site preparation needed to perform the work; Drill, develop, inspect, test, and disinfect two potable water supply wells, approximately 155 feet deep with stainless steel screens, sand filter pack, and extended surface seals; Manage and dispose of all waste products (including pump test water) and complete site restoration; File all required construction documentation with the Department of Ecology. The Work shall be substantially complete within 80 working days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk/Treasurer, City Hall, Mabton, Washington. The Proposals will be publicly opened and read aloud shortly after the time and date stated above. Proposals are to be submitted only on the form provided with the Bid Documents. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Mabton" and in an amount of not less than five percent (5%) of the total Proposal amount. The commencement date for the project will be mutually coordinated with the Contractor prior to issuance of the Notice to Proceed, with the intent that the project may begin anytime prior to August 1, 2023.

Bid Results

Water / Sewer

$453,330.00

Public - City

Site Work

6

14

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
22
Bidding Soon
335
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

August 1, 2023

Project location map

Multiple Locations, Mabton, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.