BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Morgantown, West Virginia. Contact the soliciting agency for additional information.

Maintenance, Inspection, and Testing of the Electrical Power Distribution System The Louis A. Johnson VA Medical Center is conducting this Sources Sought to identify contractors who possess capabilities to provide the services described in the Statement of Work below. As permitted by the FAR Part 10, this is a market research tool being utilized for the informational and planning purposes. Your responses will assist the Government in the development of its acquisition strategy. Response is strictly voluntary it is not mandatory to submit a response to this notice to participate in formal RFQ process that may take place in the future. However, it should be noted that information gathered through this notice may significantly influence our acquisition strategy. All interested parties will be required to respond separately to any solicitation posted as a result of this sources sought notice. Respondents will not be notified of the results of the evaluation. We appreciate your interest and thank you in advance for responding to the sources sought. This service will be implemented using the North American Industry Classification System (NAICS) Code 221122. If a small business is interested in this procurement, they must provide at least 51 percent of the services rendered. NOTES All Capability Statements/Responses to this Sources Sought Notice shall be submitted via email only to Danfeng.lu@va.gov. Telephone, Fax, or any other form of communication inquiries will not be reviewed or accepted. Responses to this Sources Sought Notice must be received no later than April 12, 2023 at 3:00 p.m. (Eastern Standard Time). This Sources Sought Notice may or may not assist the VA in determining sources only. A solicitation is not currently available. If a solicitation is issued, it may or may not be announced at a later date, and all interested parties shall respond to that solicitation announcement separately from the responses to this Sources Sought Notice. DISCLAIMER This RFI is issued for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked a proprietary will be handled accordingly in accordance with (IAW) Federal Acquisition Regulation (FAR) 15.201(e), RFIs may be used when the Government does not presently intend to award a contract, but wants to obtain price, delivery, other market information, or capabilities for planning purposes. Responses to these notices are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses incurred associated with responding to this RFI. STATEMENT OF WORK Maintenance, Inspection, and Testing of the Electrical Power Distribution System 1. Introduction: Place of performance: Louis A. Johnson VAMC 1 Medical Center Dr, Clarksburg WV 26301. Period of performance; all work is to be completed within a period of four calendar months following award of this contract. This Statement of Work (SOW) describes the requirements for the maintenance, inspection, testing, and/or calibration of the Electrical Power Distribution System and all of its components. These work items are referenced as Maintenance and Testing in this document, hereafter. It is the intention of the Louis A. Johnson VA Health Care System to acquire all labor, equipment, and materials to perform electrical testing on the facilities electrical system and components. This SOW describes the requirements for the Qualified Electrical Contract Professionals known as Contractors in this document, hereafter. Contractors who are contracted by VHA Medical Center to perform maintenance and testing of the Electrical Power Distribution System, and all of its components, shall meet or exceed all requirements stated in Section 2 of this SOW. This SOW describes the requirements to establish maintenance and testing reports. 2. Qualifications of Contractors: Contractors shall complete all testing and certifications in accordance with standards established by the National Electrical Testing Association (NETA). In addition, Contractors must complete the Occupational Safety & Health Administration (OSHA) approved 10-hour construction safety training prior to beginning work. Contractor shall submit to the contracting officer and contract officer representative copies of all applicable training prior to work commencement. Contractors shall have technical trainings, and track records of working experience in maintenance, inspection, and testing of the Electrical Power Distribution System and its components in healthcare, industrial, educational, and commercial facilities for a minimum of five (5) continuous years. Contractors shall have safety trainings either on-the-job or class-room type - in electrical safety outlined in the OSHA Standard 29 Code of Federal Regulations (CFR) 1910 Subpart S Electrical, and the NFPA 70E Standard for Electrical Safety in the Workplace. Training certifications shall be submitted to the VA Contracting Officer prior to work. If no training certifications are available, the contractor Employer shall certify that he/she has met this requirement in writing, and submit it to the VA Contracting Officer prior to starting work. Contractors shall have ready access to and apply as necessary the latest versions of the following references: NFPA 70, National Electrical Code. NFPA 70B, Recommended Practice for Electrical Equipment Maintenance. NFPA 70E, Standard for Electrical Safety for the Workplace. NFPA 110, Standard for Emergency and Standby Power System. OSHA Standard 29 CFR 1910, Subparts I & S. National Electrical Testing Association, Inc. (NETA) Maintenance and Testing Specifications. Operating/Maintenance manuals, and specifications of the electrical equipment to be maintained and tested. These documents may be obtained from the VHA Medical Center, or the equipment manufacturers. Contractors shall be equipped with all necessary tools, equipment, and Personal Protective Equipment (PPE) to perform the work safely, effectively, and timely. Tools, equipment, and PPE shall comply with the requirements of OSHA Standard 29 CFR 1910, Subpart I, and NFPA 70E. 3. Summary of Work: Work items, definitions, and references shall comply with the latest edition of the NETA Maintenance Testing Specifications. Below is a list of electrical equipment that shall be maintained, tested, and ultimately reported. TRANSFORMERS: Transformers over 500KVA shall be cleaned externally, inspected for overheating via thermal scan, and inspected for any damage to housing, connection points or insulation. Liquid filled transformers shall have cooling liquid tested to meet manufacturer s recommendation. Dry transformers will be cleaned externally, and inspected for overheating via thermal scan. ELECTRICAL GEAR (including, but not limited to, Switchgear, Switchboards, Distribution Panels, Motor Control Centers, and all related equipment): Use lint free rags to clean conductors, contact points between circuit breakers and main buss bars, buss bars, and the interior of the electrical equipment. Use a vacuum cleaner to remove large debris. (compressed air is not to be used for this purpose). Visually inspect for any obvious signs of overheating, misaligned contacts, insulation damage, or lose lugs. Lubricate all moving parts according to manufacturer s recommendation. Test and exercise circuit breakers located in switchgear, switchboards, and distribution panels to ensure operation under overload conditions. Inspect and tighten ground connections. Test ground resistance for entire facility grounding system. Identify hot spots in electrical equipment via thermal scan. Tighten problem connections to meet manufacturer s recommendations using a torque wrench or other approved device. Calibrate and maintain adjustable protective relays. Test all control systems equipment for proper operation after maintenance is performed and before placing them back in normal service. AUTOMATIC TRANSFER SWITCHES Use lint free rags to clean conductors and contact points. Use a vacuum cleaner to remove large debris. (Compressed air is not to be used for this purpose). Visually inspect for any obvious signs of overheating, misaligned contacts, insulation damage, or lose lugs. Lubricate all moving parts according to manufacturer s recommendation. Inspect and tighten connections. Test for proper switching operation. DISCONNECTS Use lint free rags to clean conductors and contact points. Use a vacuum cleaner to remove large debris. (compressed air is not to be used for this purpose). Visually inspect for any obvious signs of overheating, misaligned contacts, insulation damage, or lose lugs. Lubricate all moving parts according to manufacturer s recommendation. Inspect and tighten connections. Test for proper switching operation. Additional notes: All electrical work is executed with all proximate energized circuits de-energized when and where possible. When a planned electrical outage cannot be accomplished the following requirements are mandatory for working on energized circuits. Full personal protective equipment (PPE) will be available and worn by qualified electricians according to the guidelines outlined in NFPA 70E. A written energized electrical work permit shall be obtained from the safety office prior to any energized work. (sample included Appendix 1) This work may have to be done after regular working hours or on weekends. Provide complete written report of the work. Information shown in the report shall be as following: Company s name, address, telephone & FAX numbers. Name and signature of contractors who perform the maintenance and testing. VA Work Contract Number, name and number of VA Contracting Officer. Date and Time of work. Copies of contractors valid licenses, professional and training certificates. Descriptions and model number of specialized tools and equipment used, such as torque wrench or infra-red scanning camera. Location, Type, Name, and nameplate information of electrical equipment to be maintained and tested. Descriptions of work items. Test data. Reference materials such as equipment manufacturer s specifications, coordination study, etc. Remarks on conditions of electrical equipment. List all deficiencies, if any. Recommended corrective actions, if any. Submit four (4) hard copies of the complete written report to VA Contracting Officer and Contract Officer Representative (COR) within seven (7) calendar days of visit. Submit four (4) hard copies of the complete written report and one (1) CD of the electronic version of the report in Microsoft Word and/or Excel format to the Chief of Engineering Service within seven (7) calendar days of visit. All reference materials shall be included in the electronic version of the report, either through scanning or other means of electronic text import methods. Provide 3 sets of size E (34 by 44 inches) and 3 sets of size C (17 by 22 inches) updated and accurate one-line diagrams of the complete electrical distribution system (individual branch circuits not included). 7) Contractors shall report deficiencies that are deemed critical or catastrophic immediately to the Chief of Engineering Service for immediate actions. The method of contractor selection has not been determined at this time.

Conceptual

Medical

Public - Federal

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
98
Bidding Soon
1,326
All Active Projects
677
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 12, 2023

February 12, 2024

img_map_placeholder

1 Medical Center Dr, Morgantown, WV


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.