BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 17, 2025 at 8:00 PM

Updated August 19, 2025

Site work and paving for a road / highway in Half Moon Bay, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Update:https://tinyurl.com/3nkck8e5 This project includes operational and safety improvements to Highway 1 between North Main Street and Grandview Ave. It also includes lane intersection improvements for signalization and development of a multiuse trail on the east side of Highway 1 from Main Street North to Spindrift Way. This project is principally funded through a grant from San Mateo County Transportation Authority and also includes developmentrelated impact fees from the Pacific Ridge Subdivision (Ailanto). The project requires relocation of PG&E electric poles and includes extension of Frontage Road south to the new intersection at Terrace Avenue as well as connection to Grand Boulevard. Project is included City of Half Moon Bay Fiscal Year 2025-2029 Page no 86 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- This project includes operational and safety improvements to Highway 1 between North Main Street and Grandview Ave. It also includes lane intersection improvements for signalization and development of a multiuse trail on the east side of Highway 1 from Main Street North to Spindrift Way. This project is principally funded through a grant from San Mateo County Transportation Authority and also includes development related impact fees from the Pacific Ridge Subdivision (Ailanto). Project is included in the City of Half Moon Bay's Fiscal Year 2024-2028 Capital Improvement Program (CIP). As of June 25, 2024, information regarding a design team or a general contractor is not available. Construction is anticipated from 2024 to 2026.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$6,810,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
413
Active Projects
163
Bidding Soon
2,629
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

CA-1, Half Moon Bay, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.