BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Mattoon, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; water / sewer project; sidewalk / parking lot; and water / sewer project.

Project Category Code: Water Utilities, Construction, Sidewalks/Curbs/Gutters, Concrete/Formed/Flatwork/Foundation, Erosion Control/Slope, Bank Stabilization, Fire Hydrant, Street/Road Materials, Erosion Control - Temporary, Materials, Equipment and Supplies, Roadway Pavement Markings, Street/Road Intersection Construction and Repair, Storm Drain and Paving, Street/Roadway Reconstruction , Street/Road Pavement Marking, Water Resources Infrastructure, Equip Repair, Utility Street Construction and Excavation, Street/Road Repairs, Grubbing & Clearing, Paving (Highway, Road or Street) Description: The work for which bids are asked includes the following: 800 L.F. 1.5-inch diameter HDPE Sanitary Forcemain (Directionally Drilled) 2400 L.F. 8-inch diameter PVC C-900 Watermain 100 L.F. 6-inch diameter PVC C-900 Watermain 700 L.F. 8-inch diameter HDPE Watermain (Directionally Drilled) 50 L.F. 1-inch diameter Copper Water Lateral 20 L.F. 2-inch diameter Copper Water Lateral 125 L.F. 15 to 18-inch RCP Storm Sewer 4200 C.Y. Unclassified Excavation/Asphalt/Removals 2650 C.Y. Crushed Aggregate Base Course 9500 S.Y. Geogrid Subgrade Reinforcement 1500 TON Asphaltic Pavement 450 L.F. Epoxy Pavement Marking 1 L.S. Turf Restoration of All Disturbed Areas 1 L.S. Standby Power System - Complete Planholders list will be updated interactively on our web address at http://www.msa-ps.com under Bidding. Additional Description: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. 1835 North Stevens Street, Rhinelander, WI 54501 The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at https://sam.gov/content/wage-determinations. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates the use of Community Development Block Grant (CDBG) Funding. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. This project anticipates use of Wisconsin DNR Safe Drinking Water funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at http://water.epa.gov/grants_funding/aisrequirement.cfm. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the Village Of Mattoon.

Award

Roads / Highways

$1,176,194.00

Public - City

Paving, Site Work

41

21

7

8

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
13
Bidding Soon
252
All Active Projects
116
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

June 19, 2023

img_map_placeholder

Multiple Locations, Mattoon, WI


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.