BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Stevens Point, Wisconsin. Completed plans call for the renovation of a library.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of constructing a four-story replacement structure for Albertson Hall to accommodate a new Learning Commons and Student Success Center and associated offices and support spaces. The exterior envelope and mechanical, electrical, and plumbing systems are designed for energy efficiency. Engineered systems include mechanical and air distribution systems, a pre-action fire-sprinkler system with standpipes, detection wiring, alarm and sensing equipment, fire pump, roof-mounted photovoltaic systems along with capacity for future additional PV panels, and an exterior envelope with thermal barriers made up of curtainwall, terra cotta, face brick, and EPDM roof membrane. The outdoor plaza, Specht Forum will be replaced with a new plaza consisting of concrete pavements, pavers, plantings,and site furnishings. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. Bid Result FIRE PROTECTION WORK : J.F. Ahern Co - $ 640,043.00 PLUMBING WORK : Hooper Corporation - $ 738,680.00 MECHANICAL WORK : North American Mechanical, Inc - $ 7,250,000.00 ELECTRICAL WORK : Total Electric Service, Inc - $ 6,345,000.00

Bid Results

Library

$14,973,723.00

Public - State/Provincial

Renovation

400

44

78

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
23
Bidding Soon
252
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2023

July 3, 2023

img_map_placeholder

1801 4th Ave, Stevens Point, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.