Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Auburn, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Agencys estimated cost of the improvements is $1,988,886.80. Late submittals will be returned to bidder unopened. The bids will be publicly opened and read at 2:00 p.m. on the 12th day of May 2023, in the Auburn City Hall Council Chambers. The 2023 STREET OVERLAY PROJECT - PAVEMENT EVALUATION ZONE 2 & ZONE 4 consists of a 2-inch asphalt concrete overlay with Forta-Fi Fiber on all streets listed below, except Pleasant Ave and Ruby Street which will consist of a 3-inch asphalt concrete overlay with Forta-Fi Fiber over top a minimum of 3 inches of aggregate base. PALM AVENUE - Highway 49 to Auburn Ravine Road AUBURN RAVINE ROAD - Palm Ave/Auburn Ravine Intersection to Elm Avenue RUBY STREET - Cul-de-sac to Lincoln Way SHIRLEY STREET - Elm Avenue to Garfield Street MORGAN COURT - Magnolia Avenue to Tennis Way BOARDMAN STREET - Cherry Avenue to Linden Avenue EAST STREET - Lincoln Way to Cul-de-sac MAPLE STREET - I-80 Maple Street Off Ramp to 100' west of Lincoln Way LINCOLN WAY - 100' north of Maple Street to Oakwood Drive COLLEGE WAY - Auburn Folsom Road to Knoll Street HIGH STREET - Pleasant Avenue to Hale Street HALE STREET - High Street to Orange Street ORANGE STREET - Agard Street to Linden Avenue NEIGHBORS LANE - High Street to Orange Street PARKSIDE TERRACE - Finley Street to End BRADSHAW PARKING LOT - Lincoln Way north of Cleveland Avenue PLEASANT AVENUE BIKE PATH - Pacific Avenue to Pleasant Avenue Additional work will include over-excavation in areas of poor structural sections, planing of existing asphalt concrete along gutters and intersections, adjusting manholes, valve boxes, and other utilities to grade, site preparation and thermoplastic obliteration, and pavement restriping and traffic control for all locations. Maple Street and Orange Street will also require grinding of asphalt concrete with Portland cement concrete underneath the asphalt surface. Grinding should be no less than 1/2 inch below the adjacent lip of gutter pan at these two locations. Geotextile fabric will be placed between the grind and the 2 inch asphalt overlay. Night work will be mandatory for the Maple Street location. Hale Street and College Way from High Street to Knoll Street will require two lifts. The first lift should be a minimum of 1 1/2 inches with a 1 1/2 inch lift on top. Geotextile fabric will be placed between the two lifts. Pleasant Avenue and Ruby Street will consist of a 3-inch asphalt concrete overlay with Forta-Fi Fiber over top a minimum of 3 inches of aggregate base. The bid item for aggregate base in these locations will include all work associated with compacting, leveling, and grading base to place 3 inches of asphalt concrete above the surface. Because of the unique nature of the work required at these locations, the pre-bid job walk is mandatory to bid this project.
Award
Roads / Highways
$1,954,877.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2023
July 5, 2023
1225 Lincoln Way, Auburn, CA
Related To This Project
Auburn, CA
Bid Date: May 30 2023
Auburn, CA
Bid Date: May 19 2023
Auburn, CA
Bid Date: Oct 11 2018
Auburn, CA
Bid Date: Jun 06 2023
Auburn, CA
Bid Date: Jun 06 2023
Auburn, CA
--
Auburn, CA
--
Auburn, CA
Bid Date: May 08 2023
Auburn, CA
Bid Date: Jun 05 2023
Auburn, CA
Bid Date: Mar 31 2023
Auburn, CA
Bid Date: Apr 25 2023
Auburn, CA
Bid Date: Apr 13 2023
Auburn, CA
Bid Date: Apr 25 2023
Auburn, CA
Bid Date: Apr 03 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.