BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in West Jordan, Utah. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Work includes Mobilization, Construction Surveying and SWPPP controls, Pump House Structural construction, Generator Screening Walls and concrete pad, Pump, Shaft, and Motor, Pump Station Piping, Valving, and Chlorination System, Pipeline (including Discharge, Floor Drain, Sewer, Pump to Waste) and Pump to Waste Discharge structure, Site Improvements (including Landscaping, Fencing, Pavement and Curb), Electrical Power Supply, Electrical Systems, Instrumentation, Control Panels, Generator and Transfer Switch, and HVAC System Prospective bidders are required to attend a scheduled pre-bid conference [and site visit], if any, to address issues of special concern to bidders. The pre-bid conference [and site visit] will begin at 2:00 p.m. on Wednesday, April 12, 2023 at the project site. Any bidder arriving fifteen minutes after the above noted time shall be disqualified from submitting a bid and any bid submitted by them shall be considered nonresponsive and will not be evaluated further. Attention is directed to the condition that questions relating to the technical content of the drawings and specifications cannot be responded to orally, but must be submitted to the City in writing, and all responses will be in the form of written Addenda, which will be sent to all bidders. Meet at the Northwest corner of Ron Wood Park. If the bid is awarded as the winning bid, the bidder will promptly obtain the required bonds and insurance and will prepare the required submittal documents and execute the Contract Time is of the essence. The Work must be completed within 365 calendar days after the commencement date stated in the Notice to Proceed. The Bidder shall guarantee the Total Bid Price for a period of sixty (60) calendar days from the date of Bid opening Question Submission Close Date 4/19/2023 10:00 AM MDT The bonding range for this project is $1,700,000 - $2,000,000

Final Planning

Water / Sewer

$2,799,698.00

Public - City

Renovation, Site Work

68

29

29

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
510
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2023

January 6, 2024

img_map_placeholder

6183 W 8600 S, West Jordan, UT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.