BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Fort Collins, Colorado. Completed plans call for the renovation of a water / sewer project.

Reference Number 0000317423 Boxelder Sanitation District (District) is requesting proposals from qualified contractors to replace three (3) gearboxes on one (1) oxidation ditch at the Boxelder Sanitation District Wastewater Treatment Plant. Question Deadline 04/24/2023 at 12:00 PM MT Questions are submitted online No Contact Information Brian Zick 19704680604 brianz@boxeldersanitation.org Bobbi Munn 19704817865 bobbim@boxeldersanitation.org PROJECT HISTORY AND SCOPE INFORMATION Boxelder Sanitation District is a Special District (Quasi-Municipal), a political subdivision of the State of Colorado established under Title 32, Article 4 of the State Statutes, for the purpose of providing sanitary sewer service. The District is located in Larimer County, Colorado. It owns and operates a sewer collection system and wastewater Treatment Plant. The Treatment Plant has two (2) oxidation ditches. Oxidation Ditches No.1 was put on-line in 2013. The Oxidation Ditches are Veolia Watter Technologies dba Kruger) Bio-Denipho treatment systems. The primary aeration systems are surface mounted brush aerators with four (4) drive units per ditch. The layout of the ditches is shown on Exhibits A and A1. In 2022 the District performed an inspection of the ditch drive units and determined that there was damage to the gearboxes due to installation and maintenance issues and several were near failure. This RFP is to find qualified contractors to replace three (3) gearboxes, install one (1) new bearing and three (3) rebuilt bearings on Oxidation Ditch No. 1 A. Scope of Work Initial Inspection and Work Plan development. o Inspect the existing ditch aerator installation and determine plan for gearbox replacement. o Provide a memorandum of the contractor plan to replace the gearboxes to the District for review. Gear Replacement o Replace existing gearboxes with new MAXXDRIVE units from Nord Drive System. Existing drives are 60 HP, 9.0 meter, Maxi-Rotor systems by Kruger. o Provide all equipment, labor and material to provide for a complete installation of the new gearboxes. o Provide new Stainless Steel (SS) Flange for new MAXXDRIVE units. o Provide one new end bearing for Drive Unit No. 1 and rebuild end bearings for Drive Units No. 2, 3 and 4. o The Gearbox shall be designed for the transmitted effect of 60 HP with a lifetime calculated to 100,000 hours at full load. o The existing vertical motor shall be reused and shall be direct connected to the gear shaft by means of a maintenance free flexible coupling. By means of a maintenance free flexible coupling, the gear output shaft is connected direct to the rotor shaft with and index fit. The contractor shall level the gearbox using a machinist level accurate to 0.0005" in 10". The rotor flange shall be aligned to machined surface on the gearbox with a dial indicator to withing +/- 0.002" T.I.R. Scope of Work - District Provides: The District will provide the Contractor: A. Permission to access Treatment Plant Site B. District provided Plant manager and project manager to observe work and administer contract. C. District to provide electrician to disconnect and reconnect motors. D. District to provide necessary lifting equipment with capacity to lift and move drive components and gearboxes. E. District to provide oil for gearboxe

Post-Bid

Water / Sewer

$300,000.00

Public - City

Renovation

4

4

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
105
Bidding Soon
1,528
All Active Projects
648
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 16, 2023

June 15, 2023

January 5, 2024

img_map_placeholder

To Be Determined, Fort Collins, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.