Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Fairfield, Connecticut. Contact the soliciting agency for additional information.
Questions concerning this bid must be submitted in writing and directed only to: Ms. Lee A. Flaherty, Buyer: LFlaherty@fairfieldct.org Response will be in the form of an addendum that will be posted approximately Thursday, 27th April, 2023 to the Town of Fairfield website, It is the responsibility of each bidder to retrieve addenda from the website. Any contact about this bid between a Bidder and any other Town official and/or department manager and/or Town of Fairfield employee, other than as set forth above, may be grounds for disqualification of that Bidder. No questions or clarifications shall be answered by phone, in person or in any other manner than specified above. REQUIREMENTS 1. All equipment and materials supplied and/or installed where requested shall be new and of current manufacture, and shall meet or exceed all specifications described herein. Deviations to specifications must be indicated with the proposal response. 2. The Bidder and/or Supplier must be an authorized dealer and/or distributor for all equipment supplied and may be required upon request to provide proof of all applicable licensing and/or certification. 3. The Bidder shall remain the single-point-of-contact for warranty on all items. 4. Provide the Town with at least three (3) business or trade references. 5. Delivery: Winning bidder will be provided with a PM quarterly schedule. Filters must be delivered to each site no more than three (3) business days before the scheduled PM work and no-less than (24) twenty-four hours before the expected PM work. 6. Acceptance: The Town of Fairfield will not accept receipt of any item or equipment (installed or otherwise) unless all specifications stated in the bid document have been accommodated and/or approved by written consent. The Bidder shall be required to correct any nonconforming issues, at no expense to the Town of Fairfield. 7. Exceptions: Bidders are required to provide full details of any exceptions to the specification and details must be submitted separately and attached to the Bid Proposal Form. 8. Pricing: All costs submitted in proposal must include warranty, shipping, freight, lift-gate and inside-delivery. Pricing on all items must be held firm for the duration of the twelve (12) month contract. 9. The Town of Fairfield reserves the right to award the bid on an item-by-item basis to contractors based on lowest price, broadest product line and/or responsive delivery dates, or any combination of these criteria. The Town also reserves the right to add or delete any item as deemed necessary. 10. All quantities stated herein are based on previous usage levels and are subject to change; that is, all quantities as stated are NOT a guaranteed amount. TERM / RENEWAL OF CONTRACT The Town of Fairfield intends to award a (12) month contract with four (4) one-year optional renewal terms. On (60) days advance written notice, the Town may renew the 2023 contract per the same terms and conditions, including a mutually agreed upon optional cost of living allowance (COLA) reflecting industry standards. Each contract extension may be offered at the sole discretion of the Town of Fairfield. In the event that the Contractor does not perform the work in accordance with the specifications and/or scope of services, the Town reserves the right to terminate the contract with two (2) weeks' written notice.
Post-Bid
Educational
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2023
June 1, 2023
501 Kings Hwy E, Fairfield, CT
Related To This Project
Fairfield, CT
--
Fairfield, CT
Bid Date: May 11 2023
Fairfield, CT
Bid Date: Jun 07 2023
Fairfield, CT
Bid Date: Jun 02 2023
Fairfield, CT
Bid Date: Jun 02 2023
Fairfield, CT
Bid Date: Aug 17 2023
Fairfield, CT
Bid Date: Jun 15 2023
Fairfield, CT
Bid Date: Apr 27 2023
Fairfield, CT
Bid Date: Apr 26 2023
Fairfield, CT
--
Fairfield, CT
Bid Date: Apr 06 2023
Fairfield, CT
Bid Date: Mar 30 2023
Fairfield, CT
Bid Date: Mar 30 2023
Fairfield, CT
Bid Date: Mar 28 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.