BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling and renovation of a mixed-use development in San Diego, California. Completed plans call for the remodel of a medical facility.

Project Description: The objective of this project is for the Contractor to provide all labor, materials and equipment necessary to replace surgical lights in the Labor and Delivery Operating Rooms at the Naval Medical Center, also known as Balboa Hospital, in San Diego, CA, in accordance with all Federal, State, and Installation codes and laws, to include preparation of a design as discussed below. The contractor is required to assemble and install operating room lights in the labor and delivery operation rooms as specified on the schedule. There are a total of four labor and delivery operating rooms. The work to be conducted shall be done in two phases to include two room simultaneously, leaving two rooms open for emergency surgery. The commencement of the second phase shall not start until the first phase is 100% complete to include punch list items, therefore, leaving phase one open for emergency surgery at the start of phase two. The installation will include Class V infection control precautions, site inspection, assembly, installation, removal and disposable of old equipment, anchoring and testing of all lights upon completion. Surgical lights will be with no-break battery backup (UPS) per UFC 4- 510-01c2 Section 11-6.2 and shall comply with IEC 60601-2-41 and ANSI/AAMI ES60601-1. The contract shall refer to UFGS 26 55 80 for specification guidance. Installation of UPS shall be completed in phase one. Unless otherwise accepted, replacement of the necessary parts will be accomplished during the performance of the installation and the installer will pay current prices then in effect for such replacement for all parts. The scope of work performed under these specifications includes the furnishing of all labor, infection control barriers, hospital work permits, fire watch (as required), and parts to perform all necessary operations listed, to assure continued operating at their designed efficiency and capacity. But not limited to please review the scope of work for more information. Magnitude of Construction: $500K - $1M Prevailing Wages Apply. Contract duration = 120 days

Post-Bid

Medical

$1,000,000.00

Public - Federal

Remodeling, Renovation

7

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
728
All Active Projects
332
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2023

May 25, 2023

img_map_placeholder

34800 Bob Wilson Dr, San Diego, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.