BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Aberdeen, Washington. Design plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a bridge / tunnel; and sidewalk / parking lot.

As of December 5, 2024, this project is in the design phase. Construction will not begin until 2027. Previous solicitation listed below for reference: The City of Aberdeen is soliciting statements of qualifications (SOQs) from qualified firms to provide project management and engineering services for the North Aberdeen Bridge Replacement Project. The scope of services is anticipated to include project management, survey, pre-design report, public outreach, geotechnical analysis and design, bridge structure design, stormwater design, transportation design, environmental documentation (including NEPA/SEPA documentation), preliminary ROW activities, ROW, and construction management as part of a Federally funded project to replace the North Aberdeen Bridge (Bridge Number ABERDEEN2, SID Number 08526400). The budget for the PE Phase of the project is $3,150,000. SOQs shall be received by the City no later than the submittal deadline listed above. It is the responsibility of firms to ensure that SOQs are received by the City ontime. The existing 304-ft long bridge structure carries two 12-ft lanes of traffic and a 5-wide concrete sidewalk. The new bridge will carry 2 lanes of traffic and have a shared use path on the west side of structure to accommodate pedestrians and bicycles. The new bridge will not increase the area of pollution generating impervious surface. Specific tasks will include but are not limited to: PRELIMINARY ENGINEERING (PE) PHASE 1. Administration - Perform project management including scheduling, planning, quality control, coordination meetings, and invoice review. 2. Surveying - Develop base map showing right-of-way lines, surface features, underwater features, structures, and above & below-grade utilities. 3. Pre-Design Report - Identify important project design decisions, deviations, permitting requirements, and analysis of options for replacement, repair, and relocation of the bridge. 4. Public Outreach - Deploy early community engagement to encourage public input and participation (i.e., websites, open houses, council meetings, press releases, etc.). Work to specifically include outreach regarding options related to the preservation and/or memorialization of a local community icon, Kurt Cobain. 5. Preliminary Design - Develop preliminary design for coordination and review with City. 6. Geotechnical Design - Develop a geotechnical design for the structure foundation. 7. Structural Design - Develop a design for the bridge structure. 8. Stormwater Design - Perform stormwater calculations and deliver stormwater report. 9. Environmental Engineering - Complete the NEPA/SEPA process and obtain all required permits from local, state, and federal jurisdictions necessary to initiate the work. 10. PS&E - Develop Plans, Specifications, and Estimates for City review and deliver final 100% construction package. 11. Preliminary Right-of-way (Pre-ROW) - Identify right-of-way needs based on preliminary design and provide data, figures, next steps, and scoping estimate.

Design

Bridges / Tunnels

$3,150,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
25
Bidding Soon
603
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2027

img_map_placeholder

Multiple Locations, Aberdeen, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.