Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.
The work consists of rehabilitation of approximately 2,018 feet of existing 36- and 42-inch diameter reinforced concrete pipe (RCP) with cured-in-place pipe (CIPP) liners. The project also includes rehabilitation of six (6) existing manholes with a protective coating system, and all appurtenant work. Working Days: 160 Award: 6/14/2023 Dollar Range: Approx. $1,200,000-$1,800,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Section covers the prevailing wage rates determined by the Director of the Department of Industrial Relations of the State of California and other labor practices. This Section supersedes Sections 5-3.2 through 5-3.5 of the Standard Specifications. 1.6.2 General Pursuant to applicable provisionsof theLabor Code of theState ofCalifornia, not lessthan the general prevailing rate of per diem wages and not less than the general prevailing rate of per diem wages for legal holiday and overtime work for each craft or type of worker needed to execute the work contemplated under this Contract, as ascertained by the Director of the Department of Industrial Relations, shall be paid to all workers employed on said Work by the Contractor or by any subcontractor doing or contracting to do any part of said Work.
Award
Water / Sewer
$2,073,651.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 16, 2023
September 4, 2023
Multiple Locations, Whittier, CA
Related To This Project
Whittier, CA
Bid Date: Sep 07 2023
Whittier, CA
Bid Date: May 24 2023
Whittier, CA
Bid Date: May 11 2023
Whittier, CA
Bid Date: May 23 2023
Whittier, CA
Bid Date: May 08 2023
Whittier, CA
Bid Date: Aug 24 2023
Whittier, CA
Bid Date: Aug 22 2023
Whittier, CA
Bid Date: Apr 27 2023
Whittier, CA
Bid Date: May 04 2023
Whittier, CA
Bid Date: May 25 2023
Whittier, CA
Bid Date: Apr 27 2023
Whittier, CA
Bid Date: Apr 18 2023
Whittier, CA
Bid Date: May 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.