BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in San Rafael, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The County of Marin is seeking a professional consulting team to provide Construction Management and Special Inspection support to the Department of Public Works during the completion of improvements to the Marin Veterans' Memorial Auditorium Parking Lot. The Marin Center is located on Avenue of the Flags in San Rafael, CA. The site is just north of the Marin County Civic Center and is bounded by Lagoon Park, Civic Center Drive and Avenue of the Flags/South Fork Gallinas Creek. The campus is comprised of a variety of structures and site amenities that make up a portion of the Marin County Fairgrounds. The campus contains the following buildings: the Veterans' Memorial Auditorium (VMA), the Marin Center Exhibit Hall, a small Shop Building, Concession stands, and other small auxiliary structures. The surrounding exterior spaces include paved and unpaved parking lots, park-like landscaped areas and a small lagoon. The project scope of work will include replacement of existing deteriorated asphalt with new surface, a modernized subgrade, with permeable drainage areas and an efficient traffic and parking plan, provision for additional Wi-fi coverage & electrical power, new concrete islands, new lighting & irrigated landscaping areas to support water reclamation. The completed VMA parking lot area will include new asphalt surfaces and signage, hardscape, and plantings to better allow support of traffic, patrons and pedestrians. Question Submittal Date: 05/16/23, 4:00 PM Any questions related to this RFP shall be submitted in writing to the attention of the Project Manager at the email noted below. Mark Mancuso, Capital Project Manager (CPM) MMancuso@marincenter.org The construction contract duration is 168 working days, commencing following the Fair which is held annually in the month of July. On-site construction activities, including mob/demob, will be performed during the 8-month period running from mid-July 2023 to March 2024.

Conceptual

Sidewalks / Parking Lot

$180,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
49
Bidding Soon
1,712
All Active Projects
732
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

img_map_placeholder

10 Ave of the Flags, San Rafael, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.