Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2025 at 7:00 PM
Updated February 7, 2025
Site work and paving for a sidewalk / parking lot in San Rafael, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Per the owner, as of February 6, 2025, this project has been completed. Closed solicitation has been included below for reference. ............. The County of Marin is seeking a professional consulting team to provide Construction Management and Special Inspection support to the Department of Public Works during the completion of improvements to the Marin Veterans' Memorial Auditorium Parking Lot. The Marin Center is located on Avenue of the Flags in San Rafael, CA. The site is just north of the Marin County Civic Center and is bounded by Lagoon Park, Civic Center Drive and Avenue of the Flags/South Fork Gallinas Creek. The campus is comprised of a variety of structures and site amenities that make up a portion of the Marin County Fairgrounds. The campus contains the following buildings: the Veterans' Memorial Auditorium (VMA), the Marin Center Exhibit Hall, a small Shop Building, Concession stands, and other small auxiliary structures. The surrounding exterior spaces include paved and unpaved parking lots, park-like landscaped areas and a small lagoon. The project scope of work will include replacement of existing deteriorated asphalt with new surface, a modernized subgrade, with permeable drainage areas and an efficient traffic and parking plan, provision for additional Wi-fi coverage & electrical power, new concrete islands, new lighting & irrigated landscaping areas to support water reclamation. The completed VMA parking lot area will include new asphalt surfaces and signage, hardscape, and plantings to better allow support of traffic, patrons and pedestrians. Question Submittal Date: 05/16/23, 4:00 PM Any questions related to this RFP shall be submitted in writing to the attention of the Project Manager at the email noted below. Mark Mancuso, Capital Project Manager (CPM) MMancuso@marincenter.org The construction contract duration is 168 working days, commencing following the Fair which is held annually in the month of July. On-site construction activities, including mob/demob, will be performed during the 8-month period running from mid-July 2023 to March 2024.
Occupancy
Sidewalks / Parking Lot
$180,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2023
10 Ave of the Flags, San Rafael, CA
Related To This Project
San Rafael, CA
Bid Date: May 08 2023
San Rafael, CA
Bid Date: May 18 2023
San Rafael, CA
Bid Date: May 18 2023
San Rafael, CA
Bid Date: Jun 15 2023
San Rafael, CA
Bid Date: Jul 06 2023
Construction of Non-Motorized Pathway from McInnis Pky to Smith Ranch Rd (MP 20.1-MP 21.0) - 5079472
San Rafael, CA
Bid Date: Jun 20 2023
San Rafael, CA
Bid Date: Jul 11 2023
San Rafael, CA
Bid Date: Oct 05 2023
San Rafael, CA
Bid Date: May 11 2023
San Rafael, CA
--
San Rafael, CA
Bid Date: May 11 2023
San Rafael, CA
Bid Date: May 23 2023
San Rafael, CA
--
San Rafael, CA
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
