Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Sheridan, Wyoming. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Contract Award Date: Jul 26, 2023 Contract Award Number: 1282B123C0023 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: PBZQR7SWKLH2 Contractor Awarded Name: TK3, LLC Contractor Awarded Address: Cody, WY 82414 USA Base and All Options Value (Total Contract Value): $384,980.00 Project Title: Cedar Creek and Driveway Trail Bridge Replacements, Bighorn National Forest (NF), Region 2, Wyoming. Driveway Trail Bridge Description of Work- The work for the Driveway trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 61' glulam stringer trail bridge with timber sill on geocell pad, aggregate surfacing, riprap placement and all other incidental items necessary to complete the project in accordance with plans and specifications. Cedar Creek Trail Bridge Description of Work- The work for the Cedar Creek trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 40' glulam stringer trail bridge with timber sill on geocell pad, an optional item for existing trail restoration and all other incidental items necessary to complete the project in accordance with plans and specifications. Project Location - Driveway Trail Bridge Location- From Sheridan, Wyoming, head south on interstate 90 for approximately 31 miles to exit 56A towards Buffalo, Wyoming. Continue on this road for approximately 2 miles, then turn right onto US-16 West. In approximately 46 miles, turn right at the junction of NFSR #27. Travel on NFSR #27 for approximately 2 miles. From here, there is a native surface unimproved road for 0.3 miles to within approximately 100' of the bridge site. Trail Bridge coordinates: 44 11' 40.20" N, -107 14' 35.16" W Cedar Creek Trail Bridge Location - From Sheridan, Wyoming, head north on interstate 90 for approximately 11 miles to exit 9. Head westbound on US-14 for approximately 52 miles to the junction of NFSR #264 (Cedar Creek Rd.). NFSR #264's approach is a narrow, steep, four-wheel drive road for the first 1.3 miles. At the location of Trail 055, the four-wheel drive road ends and the road becomes a trail for the next mile to the bridge site. For the remaining 1 mile, currently the trail conditions would not allow access for an ATV. There is an optional work item for the reconstruction of the 1 mile of trail to provide access to the bridge site with an ATV. It is anticipated that the bridge stringers and other materials will need to be delivered to the site using a helicopter. Trail bridge coordinates: 44 36' 16.88" N, -107 39' 17.43" W. Project Title: Cedar Creek and Driveway Trail Bridge Replacements, Bighorn National Forest (NF), Region 2, Wyoming. Driveway Trail Bridge Description of Work- The work for the Driveway trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 61-glulam stringer trail bridge with timber sill on geocell pad, aggregate surfacing, riprap placement and all other incidental items necessary to complete the project in accordance with plans and specifications. Cedar Creek Trail Bridge Description of Work- The work for the Cedar Creek trail bridge includes but is not limited to the removal of the existing bridge structure, the installation of a 40-glulam stringer trail bridge with timber sill on geocell pad, an optional item for existing trail restoration and all other incidental items necessary to complete the project in accordance with plans and specifications. NAICS Code: 237310 - Highway, Street, and Bridge Construction PSC Code: YlLB - Construction of Highways, Roads, Streets, Bridges, and Railways Size Standard for NAICS: $45M Project Magnitude - $250,000.00 and $500,000.00 The offeror is required to comply with the Department of Labor Davis Bacon-Act Wage Determinations for this effort. Wage Determinations can be found at https://www.sam.gov/. All Amendments to the Solicitation must be acknowledged in Block 19 at time of proposal or by submitting the signed SF-30(s) with your price proposal. For any questions regarding this Solicitation please contact Contract Specialist, Holly Hlavac at Holly.Hlavac@usda.gov. Questions Due: 5/23/2023 at 9:00 AM Pacific Standard Time (PST) Proposals Due: 6/21/2023 at 9:00 AM Pacífic Standard Time (PST) Questions and Proposals are to be submitted to Holly Hlavac at Holly.Hlavac@usda.gov. Attachment 1 - Cedar Creek Bridge Plans Attachment 2 - Driveway Bridge Plans Attachment 3 - Trail Specifications Attachment 4 - Schedule of Items Attachment 5 - Wage Determination Big Horn County Delivery: 11/14/2024 Delivery Location Code: 8538 BIGHORN NATIONAL FOREST TONGUE RANGER DISTRICT 2013 EASTSIDE 2ND ST SHERIDAN WY 82801-9638 US Period of Performance: 07/17/2023 to 11/14/2024 Driveway Trail Bridge Description of Work- Continued
Award
Bridges / Tunnels
$384,980.00
Public - Federal
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 21, 2023
July 17, 2023
2013 Eastside 2nd St, Sheridan, WY
Related To This Project
Sheridan, WY
Bid Date: May 17 2023
Sheridan, WY
Bid Date: Jun 10 2023
Sheridan, WY
Bid Date: Jun 08 2023
Sheridan, WY
Bid Date: Jun 16 2023
Sheridan, WY
Bid Date: Jun 08 2023
Sheridan, WY
Bid Date: Feb 20 2020
Sheridan, WY
Bid Date: Jun 28 2023
Sheridan, WY
Bid Date: Jul 06 2023
Sheridan, WY
Bid Date: May 10 2023
Sheridan, WY
Bid Date: May 04 2023
Sheridan, WY
Bid Date: Jan 31 2023
Sheridan, WY
Bid Date: Mar 24 2023
Sheridan, WY
Bid Date: Jan 26 2023
Sheridan, WY
Bid Date: Feb 01 2023
Sheridan, WY
Bid Date: Mar 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.