BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Daly City, California. Completed plans call for site work for a municipal facility.

**As of June 26, 2023, project was awarded to Golden Bay Construction, Inc, awarded amount is $465,269.50.** The project proposes to install bulb-outs; upgrade curb access ramps to meet current American with Disabilities (ADA) standards and install bicycle lanes and routes. The project's general design includes minor concrete work; new sidewalk, ramps, curb and gutter installation, utility box adjustments; installation of signage, sniping and thermoplastic markings; installation of pedestrian amenities, such as upgraded push buttons and trash receptacles. The proposed work will also install a new pedestrian crossing across Junipero Serra Boulevard at Washington Street on the east side of the intersection which includes traffic signal modifications and installation of pedestrian push buttons. This project is federally funded, making the Buy America provisions applicable. Bids shall be accompanied by a bid bond, cash, certified or cashier's check payable to City of Daly City, in an amount not less than 10% of the aggregate bid. The time limit for the completion of work is seventy (70) working days. The first day of this time period will be no later than the 28th calendar day after the contract award or within fifteen (15) calendar days after the issuance of the Notice to Proceed. The project has a goal of 11% Disadvantaged Business Enterprise (DBE) participation. If the DBE Commitment form (Section 00496 of these Contract Documents) is not submitted with the bid, all bidders must complete and submit the DBE Commitment form to the City no later than 4:00 p.m. on the 41° business day after bid opening. The City reserves the right to reject any or all bids and to waive any informality in such bids and, if awarded, to award the contract in the best interest of the City. Questions should be directed to the office of the City Engineer, attention Shirley Own, Project Manager, 333.90th Street, Daly City, California 94015, telephone (650)991-8064, Fax (650)991-8243.

Award

Municipal

$465,270.00

Public - City

Site Work

9

7

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
83
Bidding Soon
1,831
All Active Projects
746
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2023

June 26, 2023

img_map_placeholder

To Be Determined, Daly City, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.