BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Independence, Louisiana. Completed plans call for site work for a pipeline.

A. Principal Features of the work may include 1. Mobilization and demobilization of equipment, materials, and labor. 2. Construction and removal of temporary facilities. 3. Installation of 24 and 18 Header Lines. 4. Installation of 8 and 6 Lateral Lines. 5. Installation of 2 SDR-9 airline and 4 SDR-11 condensate forcemain lines. 6. Installation of eight (8) new Vertical Extraction Wells. 7. Installation of six (6) Leachate Riser Connections. 8. Installation of three (3) Condensate Sumps (In Waste). 9. Installation of three (3) Dual Contained Condensate Sumps. 10. Installation of one (1) Dual Contained Condensate Sump with Drain. 11. Installation of three (3) Isolation Valve Stations B. The above description of the work is for general information only, and does not limit the responsibility of the Contractor to accomplish the work in strict accordance with the Contract Drawings and Specifications. C. Environmental Observations: The Work shall be performed in strict accordance with the applicable requirements of the state and local agencies having jurisdiction, and in accordance with the requirements of the Standard Conditions, and these Specifications. The Tangipahoa Parish Government Reserves the Right To Reject Bids Inaccordance With the Law. Contractor Questions -5/4/2023 (Noon CST)

Award

Pipeline

$1,499,384.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
45
Bidding Soon
524
All Active Projects
232
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

June 15, 2023

img_map_placeholder

57510 Hano Rd, Independence, LA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.