BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, new construction and addition to a municipal facility in Las Vegas, Nevada. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.

Estimated Project Cost: $6,000,000 to $8,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Preconstruction Services shall include constructability reviews, construction cost estimates, advice, project analysis and feedback regarding materials, methods, systems, schedule, labor and other conditions affecting construction and subcontractor selection for development and construction of the Project. Preconstruction services are anticipated to begin 7/2023 and construction is anticipated to begin 10/2023 with estimated completion 4/2024. Question Cuttoff Date & Time 5/18/2023 08:30:00 PM (ET) Project Organization and Key Positions. Applicant shall provide a proposed project organization to support the Project based on the CMAR-provided preconstruction services, the draft scope of work and schedule contained in the "Project Details" section above, and the Applicant's approach to construction and project closeout activities. Applicant shall identify a minimum of three (3) and maximum of seven (7) CMAR-provided positions they have identified as Key to this Project. Applicant shall provide a brief narrative of the roles and responsibilities associated with each of these Key Positions. Narrative should demonstrate the continued involvement of Key Personnel throughout preconstruction, construction and project closeout activities The Owner reserves the right, when considered necessary or appropriate, to respond to questions or modify this RFP. Such responses or modifications, if any, shall be in the form of an Addendum which shall be issued through NGEM. The Owner is not bound by any oral representations, clarifications or changes made in connection to the RFP by the Owner's employees, agents or consultants, unless in the form of a properly issued Addendum. Applicant must comply with all federal, state and local laws and regulations relative to conducting business in the City of Las Vegas and the County of Clark, Nevada, including but not limited to, licensing, labor and health laws as well as all applicable Nevada Revised Statutes. The laws of the State of Nevada will govern as to the interpretation, validity and effect of this RFP, selection of Applicant and subsequent contract award. In accordance with Nevada Revised Statutes (NRS 338), the City of Las Vegas (Owner) seeks a Construction Manager at Risk (CMAR) to provide preconstruction and construction services for the development and construction of 23.MWA949.C1-SK CMAR for DPS Unit 5 & 6 Restroom Addition (the Project). Per NRS, selection of the CMAR must be completed using a two-phased approach. Phase I is the Request for Proposals (RFP). Phase II is an interview process, which is comprised of Applicants who submitted the highest-ranked Proposals.comply with all federal, state and local laws and regulations relative to conducting business in the City of Las Vegas and the County of Clark, Nevada, including but not limited to, licensing, labor and health laws as well as all applicable Nevada Revised Statutes. The laws of the State of Nevada will govern as to the interpretation, validity and effect of this RFP, selection of Applicant and subsequent contract award.

Post-Bid

Municipal

$8,000,000.00

Public - City

Addition, Demolition, New Construction, Site Work

65

5

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
441
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

October 2, 2023

img_map_placeholder

3100 Stewart Ave, Las Vegas, NV

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.