BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a bridge / tunnel in Prince George, British Columbia. Completed plans call for site work for a bridge / tunnel.

The proposed contract is for the supply and installation of metal materials for the repair to the steel portion of 33 bridge structures. There are 29 structures located at the Windy Point bridge yard at 1.5km on the Finlay FSR, 2 of these structures will be required to be transported to a shop environment for repairs. BCTS will be responsible for the delivery and return of the structures to the Windy Point Yard. The other 4 structures are located in the Prince George district compound. Documents can be obtained from www.bcbid.gov.bc.ca Award is subject to final approval.

Award

Bridges / Tunnels

$100,000.00

Public - State/Provincial

Site Work

6

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
2
Bidding Soon
61
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

July 3, 2023

Project location map

Multiple Locations, Prince George, BC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.