BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Pierce, Florida. Working plans call for site work for a water / sewer project.

As per the Owner the project has been rejected. Editorial Content Team is actively seeking updated information. Letting: 05230606 Call Order: 002 Proposal: E51C7 District:05 Counties: Brevard,Orange Road Name: Sr 5 (US 1) & SR 50 Outfall Restoration Limits: Midpoint Project(s): 41232657228(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 110 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Description: FDOT District 5 Proposal ID No.: E51C7 Financial Project No.: 412326-1-72028 Fiscal year: 2023 Counties: Brevard & Orange Contract Calendar Days: 110 Lead Time: 30 Days This is a Maintenance Lump Sum Contract. Intent: The work under this Contract consists of the restoration of existing drainage outfalls, including grading, installation of drainage structures, and sodding. Experience: For this Contract the Contractor is required to have at least three (3) years of experience in the performance of Drainage Repair, or the Project Superintendent must have at least three (3) years of like experience as a Superintendent. A Contractor that presently has a certificate of prequalification with the Department in "Drainage" will suffice to meet the above requirements. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FLDOT - Call Order: 002 Drainage Outfall Restoration - Sr 5 (US 1) and SR 50

Final Planning

Water / Sewer

$3,712,340.00

Public - State/Provincial

Site Work

101

5

2

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
689
All Active Projects
337
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

September 16, 2023

img_map_placeholder

US-1 & FL-5, Fort Pierce, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.