EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 27, 2023 at 7:00 PM

Updated October 1, 2024

Site work and renovation of a bridge / tunnel in Boiling Springs, Pennsylvania. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.

As of November 21, 2023, the project has been awarded. A timeline for construction has not been confirmed. The work will include the repair/maintenance of 7 bridges within the township. Repair items that shall be completed, along with bridge locations, are listed in the document titled "Summary of Needed Repairs" available in the "DOCUMENTS" tab in PennBID in the "Specifications and Contract Documents" folder. A comprehensive list and associated descriptions/instructions are included in the individual bridge inspections reports also available electronically, in the "DOCUMENTS" tab within PennBID in the "Bridge Inspection Report" folder, and should be referred to for project specifics. Note, some repair items are scheduled to be completed by South Middleton Township, refer to the above mentioned "Summary of Needed Repairs" regarding items to be completed by the Contractor. Bids will be based on a lump sum bid. The Contract will be subject to the Pennsylvania Prevailing Wage Act. The Township shall provide a written Notice to Proceed to the Contractor Question Deadline: 6/2/2023 at 12:00 PM ET

Award

Bridges / Tunnels

$194,444.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
93
Bidding Soon
1,321
All Active Projects
622
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2023

July 7, 2023

img_map_placeholder

Multiple Locations, Boiling Springs, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

South Middleton Township Bridge Repairs

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.