BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Boiling Springs, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Sunset Drive(T502) from a point 180ft. West of Oak Drive to/and including Cul-de-sac and HillTop Drive(T355) to Mcland Drive (T650) intersection. Mill full width of roadways from curb to curb, 1 1/2" depth maintaining the crown in center of roadways.Mill notches at all street ends. Mill as necessary at inlets. Township will haul away from mill and retain millings. Oil and Chip Seal surface. Lay out centerline, clean surface of loose material. Pave 1 1/2" compacted depth overlay curb to curb. Seal all joints and curbs (excluding manholes and valve boxes). Contractor may not proceed until township has completed adjusting manhole heights and repaired inlet boxes. As of August 21, 2023, the project was awarded to thelowest bidders as follows: Alexander Spring Road/TyleyCourt- Pennsy Supply, Inc. - $ 161,825.50 South View Neighborhood (Hilltop Driv, Sunset Drive)- Pennsy Supply, Inc.- $197,457.78 Zion Road- Wilson Paving - $125,176.32

Award

Roads / Highways

$484,460.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
366
Active Projects
176
Bidding Soon
1,849
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2023

July 5, 2023

Project location map

Multiple Locations, Boiling Springs, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.