BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 18, 2023 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Keene, New Hampshire. Contact the soliciting agency for additional information.

County Of Cheshire In Collaboration With The Monadnock Region Rail Trail Collaborative & Keene Sno-riders Request For Quotes Cheshire Rail Trail Rehabilitation Surry Section The County Of Cheshire Is Requesting Formal Quotes From Qualified Contractors For Tree Removal. The estimated date for selection of contractor is Friday, June 9, 2023. The estimated start date for contract is Monday, June 12, 2023. The estimated completion date for contract work is Thursday, November 30, 2023. Remove all trees in the rail bed and trail footprint on an approximately one mile segment of the Cheshire Rail Trail from the Keene Recycling Center and Transfer Station (approx. GPS 42.978690, -72.350118) to the trail access point on NH Rt 12 across from the Summit Winery (approx. GPS 42.981623, -72.364117). Specifically, mow back all of the small brush on both sides of the trail entrance on NH Route 12 and both sides of the rail trail for the entire mile. Cut all of the trees growing out of the rocks on both sides through the two rock cuts. Chip the brush and move the wood to the two designated spots on the trail. Cut any hazardous or leaning trees over the trail. Stumps are not to be removed. The trail will be closed during the work. Prevailing wage rates do not apply. Quotes should clearly and concisely address the complete scope of work as stated above. Quotes shall distinctly indicate any contingencies, exceptions, or additions, or other deviations from the scope of work stated above. Provide a fixed all-inclusive single gross price; and if available separately show reduction for any discounts or donations, as well as the net This is a grant-funded project and qualifies for a 501(c)3 tax deduction). The price shall be the entire price needed to complete the project according to the scope of work described above and inclusive of the contractors supply of all equipment, materials, supplies, labor, and any other items or services necessary to complete the scope of work.

Post-Bid

Municipal

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
521
Active Projects
213
Bidding Soon
3,899
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2023

June 12, 2023

Project location map

Multiple Locations, Keene, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.