BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Plainfield Township, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

(1.9-Mile) Crack and Joint Sealing project consisting of crack routing and filling of longitudinal joints, grading and shaping shoulders and pavement re-striping on IL 7 and IL 53 (Broadway Street) from Renwick Road to North of Caton Farm Road in the Cities of Lockport and Crest Hill in Will County. Region 1 District 1 Federal Project # NHPP6L60(851) County(s) Will Key Route(s) FAP 112 Marked Route(s) IL 7 & IL 53 Section(s) 21-00190-00-rs (Elgin) State Job #(s) C-91-264-22 PPS #(s) 1-81025-0000 20 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 012 - Crack and Joint Sealing Project Consisting of Crack Routing and Filling of Longitudinal Joints, Grading and Shaping Shoulders and Pavement Re-striping on IL 7 and IL 53 This improvement begins at a point of the centerline of IL 7 & IL 53 (Broadway St.) approximately 440 feet north of Caton Farm Road and extends in an northerly direction to a point approximately 148 feet south of Renwick Road for total distance of 9834 feet (1.86 miles). This project is located in the Cities of Lockport and Crest Hill within Will County.

Award

Roads / Highways

$145,907.00

Public - State/Provincial

Paving, Site Work

14

6

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
194
Bidding Soon
4,201
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2023

July 17, 2023

Project location map

IL-53 & IL-7, Plainfield Township, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.