Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a power facility in Fort Peck, Montana. Completed plans call for the renovation of a power facility.
Project Description: The Fort Peck Project is located in Fort Peck, Montana on the Missouri River, approximately 20 miles from Glasgow, Montana. There are two plants; Plant 1 contains three generating units; Plant 2 contains two generating units. The Fort Peck Batteries have reached end-of-life cycle and exhibiting signs of failure, it is imperative to start a replacement process. This project will involve the replacement and testing of the Station Service Battery system at the Ft Peck Project. The contractor shall supply and install the following components: a. Power Plant #1 UPS Battery: Procurement of one (1) each sixty (60) cell stationary flooded cell lead acid battery bank. b. Power Plant #1 Station Service Battery: Procurement of one (1) sixty {60) cell stationary flooded cell lead acid battery bank. c. Power Plant #2 Station Service Battery Testing: Capacity testing of one (1) existing sixty (60) cell stationary flooded cell lead acid battery bank located in Power Plant #2. d. Power Plant #1 UPS Inverter/Charger: Optional - Procurement of One (1) Inverter Charger e. Power Plant #1 & 2 Battery Chargers: Optional - Procurement of Four (4) Battery Chargers f. New Battery Rack: Optional - Provide and install if replacement batteries are not compatible with the existing battery rack. The Contractor will be required to commence work upon receipt of contract award and complete the work 210 days after receipt of Notice to Proceed, this is subject to change after solicitation issuance. Site Visit: A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27. The site visit is tentatively scheduled for 20 June 2023 at 0900 MT. See Statement of Work for more details. Estimated Construction Costs: The estimated construction cost of this project is between $250,000 and $500,000 This project will involve the replacement and testing of the Station Service Battery system at the Ft Peck Project ATTENTION CONTRACTORS: Please ask all questions by sending the Contracting Specialist an email directly instead of looking for the Projnet link. Due to timing of when the quotes are due, an amendment cannot be completed at this time. Therefore, all questions be directed to the Contracting Specialists email (lynne.d.reed@usace.army.mil). All questions need to be to her by COB on Wednesday 28 June 2023. All answers will be provided to the contractors by 2:00 PM on 30 June 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Power Plant
$500,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2023
August 24, 2023
To Be Determined, Fort Peck, MT
Related To This Project
Fort Peck, MT
Bid Date: Aug 28 2023
Fort Peck, MT
Bid Date: Mar 19 2024
Fort Peck, MT
Bid Date: Aug 09 2024
Fort Peck, MT
--
Fort Peck, MT
Bid Date: Oct 10 2024
Fort Peck, MT
Bid Date: May 17 2023
Fort Peck, MT
Bid Date: Jun 22 2023
Fort Peck, MT
Bid Date: Dec 17 2020
Fort Peck, MT
Bid Date: Aug 29 2022
Fort Peck, MT
Bid Date: Aug 29 2022
Fort Peck, MT
Bid Date: Apr 13 2023
Fort Peck, MT
Bid Date: Mar 21 2023
Fort Peck, MT
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.