BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Nantucket, Massachusetts. Completed plans call for the renovation of a educational facility.

Remove carpeting and install rubber tile flooring in five classrooms. bids for the supply of all labor, material and equipment necessary to replace the flooring in five (5) classrooms Questions concerning this IFB must be submitted in writing to: Diane A. O'Neil, Director of Facilities & Grounds, 10 Surfside Road, Nantucket MA 02554 before 11:00 AM, May 24, 2023 Questions may be delivered, mailed, emailed (oneild@npsk.org) or faxed The Nantucket Public Schools, through its School Committee invites qualified bidders to submit bids for the supply of all labor, material and equipment necessary to replace the flooring in five (5) classrooms (A1, A2, A3, A4, A5). To make an appointment to view the space and measure the areas please call Chip Clunie 508-228-7290 EXT 2147. This work must be done between July 1, 2023, and August 18, 2023. Contractor shall supply all labor, material, and equipment necessary to perform services in a workmanlike manner in accordance with all standard industry practices and properly dispose of all accumulated debris for the removal of carpeting and cove base and replace with ROPPE rubber tile exactly as shown in the photo below. This work willbe done in five (5) classrooms, A1, A2, A3, A4, A5. The substrate willbe prepped in accordance withmanufacturer's recommendations and standard practices for this type of demolition & installation. All cove-base will be replaced in all rooms tomatch adjacent rooms. Scope of Work: o Demo - Remove all existing carpeting and any mastic, glues and/or residue to reveal a clean and level substrate. o Demo - All cove-base. o Prepare all surfaces to accept new materials. Skim-coat/patch if necessary. o Install new ROPPE rubber tile in accordance with manufacturer's recommendations. o Install new cove-base (to match) according to manufacturer's recommendations. o The contractor is responsible for all permitting, cleanup, and proper disposal of all materials Each roomis approximately 870 square feet. Measurements of each space are the sole responsibility of the contractor. Complete clean-up of the site and disposal of allmaterials removed, and debris is the responsibility of the contractor and should be included in the bid. The contractor is NOT to use the school dumpster for any reason.

Bid Results

Educational

$85,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
101
Bidding Soon
1,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

July 1, 2023

Project location map

30 Surfside Rd, Nantucket, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.