BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ellington, Connecticut. Working plans call for site work for a library; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of July 17, 2023, The project will rebid. No definite date for the rebid.** As of June 22, 2023, this project has not yet been awarded. A timeline or award has not yet been established. The Town reserves the right to amend or terminate this invitation to bid, waive any informality, omission, or technical defect in the Bid Form, and to reject any or all proposals or to accept the proposal deemed most satisfactory to the Town of Ellington, if it is in the public interest to do so The anticipated construction start date is July 17, 2023. The project shall be substantially completed by October 15, 2023, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before June 1, 2024. The work to be performed under this contract includes a parking lot expansion and new stenciled sidewalk at the Hall Memorial Library, 93 & 99 Main Street in Ellington. The scope of work includes reclamation and re-pavement of 2,575 square yards of existing bituminous parking lot, installation of approximately 2,700 square yards of new bituminous parking lot and 5,315 square feet of stenciled concrete sidewalk. The project consists of providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to completion of the work shown on the plans and described in the specifications including, but not necessarily limited to the following: tree and shrub removal, reclamation and re-use of existing bituminous pavement, demolition and disposal of existing curbing and concrete sidewalk, installation of storm drain structures and piping, installation of new bituminous parking lot, installation of pole mounted light fixtures, installation of new stenciled concrete sidewalk and curb ramps, installation of a segmental block sitting wall, landscaping and field verifying. Question Deadline 06/15/2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to Finance Department in writing .

Final Planning

Sidewalks / Parking Lot

$1,020,577.00

Public - City

Paving, Site Work

12

10

10

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
276
Bidding Soon
3,940
All Active Projects
1,730
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

January 17, 2024

img_map_placeholder

93 Main St, Ellington, CT


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.