BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Fernandina Beach, Florida. Conceptual plans call for site work for a water / sewer project.

As of August 15,2023, project is cancelled. Project is no longer needed. The City of Fernandina Beach, Florida (City) is accepting competitive sealed bids for THE RELOCATION OF APPROXIMATELY 500 LF OF 12" dia. WATER MAIN ON AMELIA ISLAND PARKWAY IN FERNANDINA BEACH. The City of Fernandina Beach, Florida is requesting Guaranteed Maximum Price bid submittals from qualified teams to provide relocation of approximately 500 linear feet of water main that will connect to the existing main within the Amelia Island Parkway Right-of-Way on Amelia Island, Florida. Amelia Island Parkway is an existing Nassau County owned and maintained two-lane road. The City will coordinate approval for this work with Nassau County. The project will consist of two wet-tap connections of the existing active main and serve to relocate the main currently in conflict with planned improvements. Two valves shall be installed under full in-line pressure to isolate the section of main to be abandoned in place. The Contractor shall include furnish and install of two in-line valves, two wet-taps, installation of 360' of 12" water main by directional bore, and all fittings to facilitate connection. Completion- 120 calendar days

Project Abandoned

Water / Sewer

$3,000,000.00

Public - City

Site Work

3

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
76
Bidding Soon
887
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

September 15, 2023

Project location map

Amelia Island Pkwy, Fernandina Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.