BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Porterville, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

furnishing to said City all labor, materials, equipment, transportation, and services for the Main Street Reconstruction Project, including asphalt, curbs, gutter, detectable warnings, water main, video detections, lighted pedestrian crossing, fiber conduits, and all other appropriate appurtenances. A Certified Check, Cashier's Check, or Bidder's Bond in the amount of ten percent (10%) of the bid made payable to the City of Porterville will be required to accompany each proposal. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, disability, gender, age, sexual orientation, or religion will also be required. No qualified disabled person shall, on the basis of disability, be excluded from participating in, be denied the benefits of, or otherwise be subject to discrimination. The City hereby affirmatively ensures that minority business enterprises will be afforded full opportunity to submit bids in response to this notice and will not be discriminated against on the basis of race, color, national origin, ancestry, disability, gender, age, sexual orientation, or religion in any consideration leading to the award of contract. No bid will be accepted from a Contractor who is not duly licensed in accordance with the provisions of Chapter 9, Division III, of the Business and Professions Code, and has a current Class A, General Engineering, State of California Contractor's license. The right is reserved by the City of Porterville to reject any or all bids, to evaluate the bids submitted and to award the contract according to the proposal which best serves the interests of said City. The successful bidder will be required to furnish the City of Porterville with a "Performance Bond" in the amount of one hundred percent (100%) of the contract and a "Labor and Materials Bond" in the amount of one hundred percent (100%) of the contract amount. The Contractor shall have Sixty (60) working days from the effective date of the NOTICE TO PROCEED to complete the required work. The NOTICE TO PROCEED date shall be no later than July 17, 2023. The Contractor shall pay the City LIQUIDATED DAMAGES in the amount of FOUR THOUSAND DOLLARS ($4,000.00) a day for each calendar day the project is delayed beyond the "TIME OF COMPLETION DATE." Engineer's Estimate: $1,661,187.23

Award

Roads / Highways

$1,625,483.00

Public - City

Paving, Site Work

17

22

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
22
Bidding Soon
364
All Active Projects
171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2023

July 17, 2023

img_map_placeholder

Multiple Locations, Porterville, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.