Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Covington, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of June 16 the project was awarded to Eaton Asphalt for 700,021.30 . (1) Site preparation and erosion control; (2) Constructing Culvert Pipe; (3) Backfill with flowable fill; (4) Restore pavement and curbs; (5) Final dressing, cleanup, and seeding; (6) Maintaining and controlling traffic; and (7) Any other work as specified by this contract. A. Culvert Pipe. All culvert pipes shall be replaced to match the proposed pipe diameter on the Culvert Pipe Log on Page 24. All pipe shall be HDPE culvert pipe or equivalent. Design pipe for a cover height of 2 feet and pH Range M. B. Flowable Fill. Use flowable fill conforming to Section 701.02.05. C. Asphalt Pavement. Use Class 2 Asphalt Base 1.0D PG64-22 and Class 2 Asphalt Surface 0.38D PG 64-22. D. Concrete. Use Class A concrete for all concrete work. E. Maintain and Control Traffic. See Traffic Control Plan. A Bid Bond amounting to five (5%) percent of the proposed bid/proposal price must be provided with the response. The Bid Bond may be in the form of a surety bond, cashier check or other form of surety satisfactory to the county attorney. A Performance Surety Bond amounting to one hundred (100%) percent. Questions must be submitted by 4:00pm on 6/1/23. Answers shall be posted no later than 4:00pm on 6/2/23 on the online. Kenton County reserves the right at any time and for any reason to cancel this Request for Bids/Proposals, accept or reject any or all bids/proposals or any portion thereof, or to accept an alternate bid/proposal. Kenton County reserves the right to waive any immaterial defect in any bid. Kenton County may seek clarification from any bidder/offeror at any time and failure to respond promptly is cause for rejection. All materials shall be sampled and tested in accordance with the Department's Sampling Manual. Make the materials available for sampling a sufficient time in advance of the use of the materials to allow for the necessary time for testing unless otherwise specified in these Notes. Except as provided herein, maintain and control traffic in accordance with the KYTC Standard and Supplemental Specifications and the Standard and Sepia Drawings, current editions. The contractor shall maintain one lane of traffic at all times to adequately accommodate traffic through the work zone, unless otherwise noted by the Engineer. Except for the roadway and traffic control bid items listed, all items of work necessary to maintain and control traffic will be paid at the lump sum bid price to "Maintain and Control Traffic".
Award
Roads / Highways
$700,021.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2023
July 6, 2023
To Be Determined, Covington, KY
Related To This Project
Covington, KY
Bid Date: Jun 15 2023
Covington, KY
Bid Date: Jun 22 2023
Covington, KY
Bid Date: Jun 05 2023
Covington, KY
--
Covington, KY
Bid Date: Jul 13 2023
Covington, KY
Bid Date: Jul 13 2023
Covington, KY
--
Covington, KY
Bid Date: May 08 2019
Covington, KY
Bid Date: May 04 2023
Covington, KY
Bid Date: May 11 2023
Covington, KY
Bid Date: May 04 2023
Covington, KY
Bid Date: May 19 2023
Covington, KY
Bid Date: May 11 2023
Covington, KY
Bid Date: May 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.