Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Environmental remediation for a military facility in Dillon, Colorado. Completed plans call for environmental remediation for a military facility.
0002 - 07/21/2023 - THE PURPOSE OF THIS IS TO REVISE THE WORK STATEMENT AND SITE MAP/DRAWINGS TO REFLECT CHANGES MADE TO THE PROJECT. PLEASE CAREFULLY REVIEW THE REVISED DOCUMENTS TO ENSURE YOU UNDERSTAND THE REVISIONS. DUE DATE FOR OFFERS IS NOT EXTENDED. REVISED ATTACHMENTS INCLUDE THE SCHEDULE OF ITEMS, WORK STATEMENT AND J.5 FIGURES (5.1-5.4). CAREFULLY REVIEW THESE ATTACHMENTS FOR CHANGES RELEVANT TO YOUR PROPOSAL! Proposals are being solicited by the USDA, Forest Service for the Burke Martin Mine Non-Time Critical Removal Action (Non-TCRA) Project on the White River National Forest in Summit County, Colorado. The overall scope of this Removal Action is to channel mine effluent away from specific contaminate areas (waste piles and sediment tailings) and control specific contaminant areas (waste piles and sediment/tailings areas) from migration to nearby surface water or other media/areas. The contractor shall furnish all necessary and appropriate persoProposals are being solicited by the USDA, Forest Service for the Burke Martin Mine Non-Time Critical Removal Action (Non-TCRA) Project on the White River National Forest in Summit County, Colorado. The overall scope of this Removal Action is to channel mine effluent away from specific contaminate areas (waste piles and sediment tailings) and control specific contaminant areas (waste piles and sediment/tailings areas) from migration to nearby surface water or other media/areas. The contractor shall furnish all necessary and appropriate personnel, materials, equipment, and needed for, or incidental to, performing and completing work in accordance with the requirements of this PWS. Contractor, Subcontractor, and all employees are required to be certified in accordance with Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 1910.120(e)(3)(i) 40-Hour course for General Site Worker (HazWOPER). Project Location: The Burke Martin Mine Complex - is situated immediately on the west side of the Snake River approximately 0.6 miles above the Town of Montezuma on Co Rd 5 (Montezuma Road) (SUMMIT COUNTY, CO) The period of is estimated to be between July through the end of November. This depends upon the contract date and favorable site conditions into the late season. In accordance with FAR 36.204, the estimated of construction for this project is between $250,000 and $500,000. The attachment J.8 DWG file is by request. The file is unable to be uploaded to SAM or sent via due to the size (60MB). Will arrange file transfer upon request. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document.nnel, materials, equipment, and needed for, or incidental to, performing and completing work in accordance with the requirements of this PWS. Contractor, Subcontractor, and all employees are required to be certified in accordance with Occupational Safety and Health Administration (OSHA) 29 CFR 1910.120 1910.120(e)(3)(i) 40-Hour course for General Site Worker (HazWOPER). Project Location: The Burke Martin Mine Complex - is situated immediately on the west side of the Snake River approximately 0.6 miles above the Town of Montezuma on Co Rd 5 (Montezuma Road) (SUMMIT COUNTY, CO) The period of is estimated to be between July through the end of November. This depends upon the contract date and favorable site conditions into the late season. In accordance with FAR 36.204, the estimated of construction for this project is between $250,000 and $500,000. The attachment J.8 DWG file is by request. The file is unable to be uploaded to SAM or sent via due to the size (60MB). Will arrange file transfer upon request. *The for this project is based on a financial range. The is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF WORK: The overall scope of this Removal Action is to channel mine effluent away from specific contaminate areas (waste piles and sediment tailings) and control specific contaminant areas (waste piles and sediment/tailings areas) from migration to nearby surface water or other media/areas. The contractor shall furnish all necessary and appropriate personnel, materials, and needed for, or incidental to, performing and completing work in accordance with the requirements of this PWS. Offerors are encouraged to submit all questions in writing at least five (5) prior to the conference. Questions will be considered at any time prior to or during the conference; however, offerors will be asked to confirm verbal questions in writing. Subsequent to the conference, an to the solicitation containing an abstract of the questions and answers, and a list of attendees, will be disseminate
Award
Military
$556,247.00
Public - Federal
Environmental Remediation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 2, 2023
August 14, 2023
Montezuma Rd, Dillon, CO
Related To This Project
Dillon, CO
Bid Date: May 20 2021
Dillon, CO
Bid Date: Jan 12 2022
Dillon, CO
Bid Date: Aug 05 2021
Dillon, CO
Bid Date: Aug 03 2023
Dillon, CO
Bid Date: Sep 13 2023
Dillon, CO
Bid Date: Sep 06 2024
Dillon, CO
Bid Date: Feb 26 2024
Dillon, CO
Bid Date: May 15 2023
Dillon, CO
Bid Date: Apr 27 2023
Dillon, CO
--
Dillon, CO
Bid Date: Apr 11 2023
Dillon, CO
--
Dillon, CO
Bid Date: Mar 16 2023
Dillon, CO
Bid Date: Mar 10 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.