BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a transportation facility in Tucson, Arizona. Completed plans call for the construction of a transportation facility; and for site work for a transportation facility.

*As of July 31, 2024, project has been completed sometime last month. Description of Work: Replacing warehouse swamp cooler with package 20-ton A/C unit. Upgrade current warehouse A/C systems with packaged 15-ton, 4-ton, and 1-ton ductless split unit. Installation and upgrades to include new electrical work and modification to ducting. New warehouse systems will require integration into an existing Delta BMS for monitoring and controls Bid Bond: Each Bid shall be accompanied by a certified check, cashier s check, or surety bond for ten per cent (10%) of the amount of the Base Bid Substantial Completion: The successful Bidder who contracts with the TAA for the project will be required to achieve Substantial Completion of the entire Work in accordance with the terms of the parties contract not later than 365 Calendar Days after the issuance of the Notice to Proceed by the TAA. All requests for clarifications or substitutions shall be made in writing to the Engineer via email at rkunkel@kcmech.net. Answers will be provided via addendum to all bid set holders of record. The last day for questions will be Tuesday, May 30, 2023, and a final addendum, if necessary, will be issued on Wednesday, May 31, 2023.

Occupancy

Transportation Terminals

$500,000.00

Public - City

New Construction, Site Work

11

10

4

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
8
Bidding Soon
167
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

October 6, 2023

img_map_placeholder

2747 E Airport Dr, Tucson, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.