BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Tucson, Arizona. Completed plans call for the renovation of a water / sewer project.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. Solicitation number FA822723R0711 is issued as a request for proposal (RFP) and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-02 and its supplements. This announcement is filed under NAICS code 236220 with small business size standard of $39.5M and Product Supply Code Y1JZ. This acquisition entails minor construction to include installation of paint booth floor drains, required electrical connection, and plumbing to complete installation from a paint booth to specified equipment. The Government requires the completed items, in accordance with (IAW) specifications identified in Government provided Performance Work Statement (PWS) and drawings, and delivery to the 309 AMARG located at Davis-Monthan Air Force Base, AZ within 6-months after award of the contract. The Contractor shall provide on-site maintenance and support to the wastewater treatment system. These services will be provided in accordance with the specifications in the attached Performance Work Statement. Ongoing service capability will be required in vicinity of the site to address maintenance and support within ~24hrs of request. The Contractor shall design and specify all equipment needed for the Pretreatment plant to meet the specifications as listed in the scope of the PWS. The Contractor shall provide all minor construction needed to enable equipment installation and operation. The contractor shall provide standard industry warranty on all equipment items. **Please see attachment "Request for Proposal - IWTP" for an example of the the anicipated CLIN structure. Contractor format, revisions, and suggestions are permitted.** All CLINs will be established on a firm fixed price basis when applicable. Selection of awardee will include comparative analysis in accordance with FAR 13.106-2, Evaluation of Quotations and Offers, giving value to: service within the specified timeframe; price; and, meeting specifications in Performance Work Statement. **In accordance with FAR 15.403-3, Other than Certified Cost or Pricing Data is required for this acquisition. This must include, at a minimum, appropriate data on the proposed prices, adequate for determining price reasonableness. Contractor format is permitted. Populating Table 15-2 (available at https://www.acquisition.gov/far/part-15#FAR_15_408) is required, although certification of this cost and pricing data is not required. Any exceptions to the instructions specified in the Performance Work Statement must be identified in the quote. By submitting a quote, the contractor agrees to all deadlines, timeframes, and parameters unless specified as an exception in the quote. **The due date for all proposals is Friday, 02 June 2023 at 5:00 p.m. Eastern Standard Time.** All questions regarding this acquisition must be submitted by Friday, 26 May 2023 at 5:00 p.m. to allow for the Government to assess the inquiry and provide a response. Quote Submission Information: Submit quote to Contracting Officer William Weiss via email to william.weiss.1@us.af.mil, and to Contract Specialist Tanner Nielsen at tanner.nielsen@us.af.mil. RFP questions can be made via email or phone, 801-777-5326. Please submit technical questions via the email above. Attachment: 1. PWS - Industrial Wastewater Treatment Plant 2. CDRLs - Industrial Wastewater Treatment Plant ^ CDRLs to follow to all interested vendors. Contact Contracting Officer with interest to receive secure copies. FOB: Destination Delivery Schedule: 6 Months After Receipt of Offer

Post-Bid

Water / Sewer

$1,500,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
11
Bidding Soon
285
All Active Projects
92
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2023

August 21, 2023

img_map_placeholder

To Be Determined, Tucson, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.