BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Mukilteo, Washington. Completed plans call for the renovation of a clubhouse / community center.

The City of Mukilteo is requesting proposals from qualified vendors to modernize the Media Visual system for the Rosehill Community Center Point Elliot Room. The Point Elliot Room, located in the Rosehill Community Center at 304 Lincoln Ave, Mukilteo, WA, 98275, provides a facility for large scale public events. The Natatorium approx. 66ft x 52ft has large floor to ceiling windows on the West, East and North Walls with a ceiling height of approx. 25ft. This project is to update the existing Titan HD-600 8kL 720dpi projector, controlled by a Crestron touch screen controller with more modern, affordable, and durable equipment. 220 Volt power to the projector is available. The projector is approx. 30ft from the screen and the screen is sized approx. 12ft x 20ft. Seats at the "back row" are approximately 66ft from the screen. The goals of the visual upgrade are the following: 1. Improved video display clarity and illumination with overhead and OR natural ambient light. 2. Improved system connectivity to a variety of source devices. 3. Improved reliability. 4. Install and implement designed video and sound intregation solution into the existing Point Elliot Room. 5. Improved ease of use for those operating the system. The City is seeking a qualified vendor to evaluate, design, develop and install upgraded video and system controls in the Point Elliot Room. This Request is for two areas: immediate replacement of the existing system where needed, and as-needed repair and routine maintenance of the new system including the existing sound system and associated components. Only emailed (written) inquiries will receive a response. Inquiries received after 5:00pm, June 14, 2023 will be disregarded. Questions about this project should be submitted to Tony Trofimczuk at ttrofimczuk@mukilteowa.gov.

Post-Bid

Clubhouse / Community Centers

$165,483.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
89
Bidding Soon
2,324
All Active Projects
712
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 21, 2023

July 18, 2023

img_map_placeholder

304 Lincoln Ave, Mukilteo, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.