Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a municipal facility in Emeryville, California. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.
The project includes demolition of existing on-site improvements, remediation of the site pursuant to a Feasibility Study/Remedial Action Plan(FS/RAP) to be approved by the California Department of Toxic Substances Control (DTSC), and construction of new facility improvements to provide Public Works’ storage, shop space, office space, yard storage, police evidence storage, City Clerk storage, fleet fueling station, parking and solar panels. Remediation includes (i) excavation of the upper 5 feet of the entire site and to a depth of approximately 10 feet within a 1600 sq.ft. area in the vicinity of the existing building, (ii) thermal treatment of soil and groundwater in an approximately 25,000 sq.ft. area in conjunction with multi-phase extraction (MPE), (iii) after thermal treatment, in-situ polishing using organic amendments with bio augmentation within the thermal treatment area, (iv) ongoing use of MPE system following thermal treatment, (v) monitored natural attenuation (MNA) of the deeper groundwater units, (vi) vapor control system on new construction, (vii) land use controls/restrictions. Project is included in the City of Emeryville's FY 2023-2024 Capital Improvement Program (CIP). As of September 8, 2023, information regarding a design team or a general contractor is not available. A timeline for construction has not been determined.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$10,177,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 4, 2024
To Be Determined, Emeryville, CA
Related To This Project
Emeryville, CA
--
Emeryville, CA
Bid Date: Sep 07 2023
Emeryville, CA
--
Emeryville, CA
--
Emeryville, CA
Bid Date: Sep 07 2023
Emeryville, CA
--
Emeryville, CA
Bid Date: Dec 30 2021
Emeryville, CA
--
Emeryville, CA
--
Emeryville, CA
--
Emeryville, CA
--
Emeryville, CA
Bid Date: Apr 11 2019
Emeryville, CA
Bid Date: May 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.